Home / Insights / Product Design and Discovery

Product Design and Discovery

What a Discovery Phase Should Deliver in 2027: Prototypes Are Cheap, So Pay for Evidence, Decisions and a Buildable Spec

In 2026 AI tools made a clickable prototype an afternoon’s work, and on 3 November Figma’s agent began carrying prototype links into working code. A discovery phase priced in weeks now has to deliver something else. Here are the five outputs to pay for in 2027, how to check each one, and what to ask a delivery partner before you sign.

TopicsProduct Design and DiscoveryAI Agents and Automation

Key takeaways

  • A clickable prototype is no longer the scarce output of discovery. AI tools produce one in an afternoon, and since 3 November 2026 Figma’s agent reads prototype connections when it turns design frames into code.
  • Speed without direction is a measured risk. DORA found that without a user-centric focus, AI adoption can have a negative effect on team performance.
  • Pay for five outputs you can check: an evidence log, a decision record, a buildable specification, a verification plan, and an estimate with its assumptions and risks.
  • The specification now has two new readers, a coding agent and a tester. Every requirement needs an observable result, exact values, what must not happen and a test method.
  • Accept discovery like any deliverable. Apply the handover test: could another team give a comparable quotation from the outputs without a week of questions?

For years the visible result of a discovery phase was a clickable prototype. Clients could hold it, show it to a board and feel that the four weeks had produced something. In 2026 that output became cheap. AI tools produce an interactive prototype from a paragraph of text, and on 3 November 2026 Figma added a change to its release notes that removes one more manual step: when a team creates a code layer from design frames, Figma’s agent now reads the prototype connections and interactions between those frames.

As the person who plans our projects and signs off their quality, I think this is good news for buyers, with one condition. If the prototype now costs an afternoon, a discovery phase priced at several weeks has to be buying something else. This article sets out what that is: five outputs you can check, the role the prototype still plays, a three-week plan, and an acceptance checklist for the discovery phase itself.

It is written for founders, product owners and operations leaders who are about to commission discovery in 2027, from us or from anyone else. It follows my article on estimating a software project when AI agents shrink the coding line, because the two are connected: an estimate is only as good as the discovery behind it.

What changed in 2026: the prototype stopped being the scarce output

Three developments this year changed what is hard and what is easy before a build starts.

  • Design tools now produce working code. In June 2026 Figma added code layers to its shared canvas. Its chief product officer told TechCrunch the aim is to let designers, product managers and engineers iterate on ideas without needing production-quality code. The 3 November update means the links a designer draws between frames are carried into that code.
  • Specifications became an input to coding agents. GitHub’s open-source Spec Kit, a toolkit for writing a specification that coding agents then build from, reached version 1.0 on 21 August 2026. A written specification is no longer only a document for people to read. It is the instruction an agent follows, so its gaps turn into code quickly. My colleague Leo Vu explains the method in spec-driven development with AI coding agents.
  • AI prototypes proved to be usable but generic. Nielsen Norman Group tested AI prototyping tools on a real redesign and titled the result “Good from Afar, But Far from Good”. Detailed prompts and attached design files gave results close to the human version; broad prompts gave widely varying ones. The authors recommend the tools for ideation, proofs of concept and quick usability-test prototypes, not final production. A 2026 academic study in which 92 participants rated ten prototypes, five from AI tools and five from a human UX researcher, found no consistent advantage for either: both appeared among the best and the worst.

Put together, these mean the screen-drawing part of discovery is now fast for everyone. A competitor, a freelancer or your own product manager can produce a convincing prototype before the kickoff meeting. What none of these tools produce is the knowledge of whether it is the right prototype, and the decisions that make it buildable.

What the evidence says about speed without direction

Four sources point the same way: AI has made building faster, and has done much less for deciding what to build.

  • Without a focus on users, AI can make team performance worse. Google’s DORA research programme surveyed almost 5,000 technology professionals for its 2025 report and named seven capabilities that determine whether AI helps. One is user-centric focus. DORA found that it amplifies the positive effect of AI on team performance, and that in its absence AI adoption can have a negative effect. In the words of DORA’s announcement, such teams “may just be moving quickly in the wrong direction”.
  • AI’s impact is concentrated in the build. In the Product Institute’s State of AI in Product 2026 survey of 309 product leaders, 50% rated AI’s impact as high in engineering and development and 45% in design and prototyping, against 17% in strategic planning and roadmapping. The report’s own summary is that AI has barely touched the work that comes before the build.
  • Developers say the same. In the Stack Overflow 2026 Developer Survey, with more than 30,000 responses, 74% found AI tools useful for implementation and 50% for design. Among the sources of friction at work that the release reports, unclear priorities came first (17%), ahead of inefficient workflows (15%) and insufficient time or resources (14%).
  • Checking is now the expensive step. DORA’s 2026 report on the return on AI-assisted development, as summarised by InfoQ, names a “verification tax”: the time spent reviewing what AI produced. A requirement that nobody can test adds to that tax on every change.

Read these with care. The Product Institute sample is self-selected from its own communities and the report calls itself a directional snapshot. DORA’s capability findings are from 2025; DORA did not run its annual survey in 2026, so this is the most recent edition. None of these sources measured discovery phases directly. I use them for one conclusion they share: when building is cheap, the cost of a wrong or vague decision is paid sooner and more often.

The five outputs to pay for in 2027

These are the outputs I would write into a discovery agreement. Each has a check the client can perform without technical knowledge.

OutputWhat it containsHow you check it
1. Evidence logWho was interviewed or observed, what they were asked to do, what happened, and which assumptions each session confirmed or broke. Includes data samples and the systems reviewedPick any feature in the proposed scope and ask which entry in the log supports it. “The client asked for it” is a valid entry; no entry is not
2. Decision recordEach decision, the options rejected and why, who decided, the date, and the questions still open with an owner and a deadlineRead the open questions. If there are none, they have been hidden. If there are thirty, discovery is not finished
3. Buildable specificationUser journeys, business rules, roles and permissions, acceptance criteria with exact values, non-functional requirements, and what the system must not doGive one journey to a developer or tester who was not in the workshops. Count the questions they need to ask before starting
4. Verification planHow each acceptance criterion will be tested and by whom, test data, device and browser coverage, accessibility checks, and evaluation sets for any AI featureEvery acceptance criterion has a test method beside it. Any criterion marked “manual review” names the reviewer
5. Estimate with assumptions and risksA range per work package, the assumptions behind it, what would move it, and a risk register with ownersChange one assumption and ask what happens to the number. A partner who cannot answer has guessed

The prototype is missing from this list on purpose. It is still made, but as an instrument for producing outputs 1 and 2, not as a deliverable in its own right. A prototype that was never put in front of a user has produced no evidence, however polished it looks.

Outputs 3 and 4 are where a QA lead earns a place in discovery. The usual failure is a specification written by people who will never have to test it. Our guide to functional and non-functional requirements with testable examples shows the difference in wording between a requirement that can be checked and one that cannot.

Action: before signing, ask the partner for a redacted example of each of the five outputs from an earlier project. A partner who can only show screens has been selling the prototype.

What the prototype is for now

A prototype answers a question. Decide the question first, then choose the cheapest prototype that answers it.

QuestionCheapest prototype that answers itWhat it does not prove
Do the stakeholders agree on what we are building?AI-generated prototype from a short brief, made during or straight after the workshopThat users want it, or that it can be built on your systems
Can users complete the main task without help?Clickable prototype of two or three journeys, tested with five to eight people from the real user groupPerformance, behaviour with real data, edge cases
Will this work with our data and integrations?A technical spike: a small piece of real code against a copy of the real data or a sandbox of the real APIUsability or visual design
Is the AI feature accurate enough to be useful?A test set of real examples run through the candidate model, with results scored against expected answersHow people will react to its mistakes in daily use
Will investors or a board fund it?A polished prototype of the main journeyAnything about delivery cost or time

Three rules keep an AI-generated prototype from causing trouble later.

  1. Label it disposable in writing. A prototype that runs looks finished. State in the discovery report which parts are throwaway and which, if any, are intended to carry into the build. I covered that decision in what to rebuild, keep and postpone between prototype and MVP.
  2. Keep real personal data out of it. Prototyping tools send what you paste to a vendor. Use invented or anonymised records, and check the tool’s terms before uploading client documents.
  3. Do not treat it as an accessibility or security check. Generated screens often look acceptable and fail on contrast, focus order or labelling. Those requirements belong in the specification as acceptance criteria, as described in designing for accessibility from the first wireframe.

For the user sessions themselves, the method matters more than the tool. Our guide to choosing a usability testing method covers when moderated sessions are worth the extra time.

A specification an agent and a tester can both use

In 2027 the specification has two readers that it did not have five years ago: a coding agent that will act on every sentence, and a test agent or tester who must decide whether the result passes. A person fills a gap in a requirement by asking. An agent fills it by assuming, and does so with confidence. So the standard for discovery output rises. For each feature in the first release, check that the specification states:

  • The actor and starting condition: which role, in what state, with what data.
  • The outcome in observable terms: a value on a screen, a record created, a message sent. “The order is processed correctly” is not observable.
  • The business rules with exact values: thresholds, rounding, time zones, limits, what happens at the boundary.
  • What must not happen: no duplicate charge, no email to the customer before approval, no access for a role that lacks permission.
  • The failure paths: what the user sees when the payment provider is down, the file is too large or the session expires.
  • The non-functional limits: response time, supported devices, accessibility level, data retention, audit trail.
  • The test method: automated check, agent-run test or human review, and the test data needed.

A short example shows the difference. A typical workshop note reads: “Managers can approve leave requests.” The buildable version reads: “Given a leave request in status Pending for an employee in the manager’s own team, when the manager selects Approve, then the status changes to Approved, the employee’s remaining balance falls by the number of working days requested, and one notification is sent to the employee. A manager cannot approve their own request or a request from another team. Test: automated at API level, with one agent-run check of the screen.” The second version took a discovery conversation to write, because someone had to ask what happens when a manager requests leave.

If the product includes an AI agent of its own, it needs additional sections on tasks, boundaries and fallbacks; see writing requirements for an AI agent.

A three-week discovery plan

The plan below is an illustration for a first release of moderate size, such as a web application with a few roles and two or three integrations. It is not a quotation. The point is the order: the prototype moves to the first week because it is now cheap, which frees the second and third weeks for the work that tools do not do.

WeekActivitiesOutputsClient time needed
1. Align and exposeKickoff workshop on goals, users and constraints. AI-assisted prototype of the main journey produced within days and shown back to stakeholders. Review of existing systems, data and documentsFirst prototype, list of assumptions ranked by risk, decision record startedTwo half-day workshops; access to systems and sample data
2. Test the riskiest assumptionsSessions with real users on the prototype. Technical spikes on the integrations or data most likely to fail. Test-set run for any AI featureEvidence log, revised prototype, spike results, updated decision recordRecruiting five to eight users; one technical contact for system access
3. Specify and planWrite the specification and acceptance criteria for the first release. Verification plan. Architecture outline. Estimate with assumptions and risk register. Walkthrough with the clientBuildable specification, verification plan, estimate, final decision record with open questionsOne review session per journey; sign-off meeting

Two things in this plan are easy to cut and should not be. The first is the user sessions in week 2. Stakeholders reacting to a prototype is agreement, not evidence. The second is the client’s own time. Discovery fails most often because the people who know the business rules are available for the kickoff and not afterwards. Put their hours in the plan as a dependency, with names.

A QA or test lead should attend from week 1, not arrive in week 3 to write test cases. The questions that make a requirement testable are the same questions that expose a missing business rule, and it is cheaper to ask them while the stakeholders are in the room.

How to accept a discovery phase

Discovery is a deliverable and deserves acceptance criteria like any other. This is the checklist I would use as a client.

  1. The handover test. Could a different team read the outputs and give a comparable quotation without a week of questions? Discovery that only the authoring team can use has tied you to that team.
  2. Every scope item traces to evidence or a named decision. Sample ten items and follow each back to the evidence log or decision record.
  3. Every acceptance criterion is testable. Each has an observable result and a test method. Ask a tester, not the author, to confirm.
  4. The riskiest assumption was tested, not discussed. The report states what it was, how it was tested and what happened.
  5. The estimate shows its assumptions. Each range lists what it depends on. Our guide to reading a custom software estimate explains what to look for.
  6. Something was removed. A discovery that ends with a longer feature list than it started with has not prioritised. The method in cutting an MVP down to size helps here.
  7. Open questions have owners and dates. Including the ones that belong to you.
  8. You own the outputs. Documents, prototype files, spike code and research notes are yours to take elsewhere, and the agreement says so.

Action: attach this checklist, or your own version, to the discovery agreement before work starts. It is much easier to agree what done means at the beginning than to argue about it at the end.

When to shorten discovery, and when not to

Discovery is not always a multi-week exercise, and faster tools make a short version more practical. The length should follow the uncertainty, not a standard package.

SituationReasonable discoveryReason
A small internal tool replacing a spreadsheet, with one team as the only usersTwo to five days: one workshop, an AI-assisted prototype, a short specificationUsers are in the room and a wrong decision is cheap to reverse
A new customer-facing productTwo to four weeks with user sessionsThe main risk is building something people do not want or cannot use
A rebuild of a legacy systemTwo to four weeks weighted towards technical review and dataThe risk is in undocumented rules, data quality and migration. See our guide to a technical feasibility review
A product with an AI feature at its centreAdd a test-set evaluation before any estimateWhether the model is accurate enough on your data decides the scope
Regulated data or processesDo not shorten. Add the compliance owner to the workshopsRequirements found after the build are the expensive ones
A feature added to a product with live users and analyticsOften a few days, using existing usage data as the evidenceMuch of the evidence already exists

The approach to choose inside these timeboxes is a separate question; product discovery frameworks compares the common ones.

A note on our own practice, so you can tell offer from advice. PoliteTech’s discovery engagements combine workshops, research, technical review and design, and end with a backlog, an architecture outline, a clickable prototype and a delivery plan that you can take to us or to another team. Our product discovery and UI/UX service covers the design work, and the Project Estimator gives a first range before any of this starts. Preparation lists are on our planning checklists page.

Questions to ask a delivery partner

  1. What will I receive at the end besides the prototype? Can I see a redacted example of each output?
  2. How many real users will you observe, who recruits them, and what happens if we cannot get them?
  3. Which AI tools will you use during discovery, and what data of mine will go into them?
  4. Who writes the acceptance criteria, and does a tester review them before I do?
  5. Is the specification written so that coding agents and testers can work from it directly? In what format?
  6. Which assumption do you expect to be the riskiest, and how will you test it?
  7. How does the estimate change if that assumption turns out to be wrong?
  8. Who from my side do you need, for how many hours, in which week?
  9. Do I own every output, including prototype files and spike code, if I build with someone else?
  10. What would make you recommend not building this, or building something smaller?

The last question is the most useful one. A partner who has never advised a client to build less has not been doing discovery.

Frequently asked questions

What is a discovery phase in software development?

A short, paid engagement before development in which the client and delivery team agree the problem, the users, the scope of the first release, the technical approach and the estimate. Its purpose is to reduce uncertainty before the larger build budget is committed.

If AI can generate a prototype in an afternoon, do I still need discovery?

Yes, but for different outputs. A generated prototype shows what a product could look like. It does not show whether users can complete their tasks, whether the business rules are complete, whether it will work with your systems or what it will cost. Those answers are what discovery is for.

What should a discovery phase deliver in 2027?

Five things you can check: an evidence log, a decision record, a buildable specification with acceptance criteria, a verification plan and an estimate with its assumptions and risks. A prototype is a tool used to produce the first two.

How long should discovery take?

It depends on the uncertainty. A small internal tool may need two to five days. A new customer-facing product or a legacy rebuild usually needs two to four weeks. Regulated products should not be shortened.

Can I use the discovery outputs with a different development company?

You should be able to. Ask for ownership of all outputs in the agreement, and apply the handover test: could another team give a comparable quotation from the documents without a week of questions?

Who should take part in discovery from the client side?

The person who owns the budget decision, the people who know the business rules in detail, a technical contact for existing systems, a compliance owner if regulated data is involved, and access to real users. Their time should be written into the plan.

Sources and methodology

Figures were checked against the sources below on the access dates shown. Two are surveys with self-selected or community samples, and I have said so where I use them. None of the sources measured discovery phases directly; the five outputs, the three-week plan, the acceptance checklist and the suggested durations are my professional judgement as a PM-QA lead, not published benchmarks. The leave-approval example and the plan are illustrations, not client work.

  1. Figma release notes: Code layers pick up prototype connections from frames (3 November 2026) — accessed 19 November 2026, read through the releases.sh index of Figma’s release notes. The agent reading prototype connections and interactions when a code layer is created from design frames.
  2. TechCrunch: Figma adds code layers, support for animations and more AI features in new update (24 June 2026) — accessed 19 November 2026. The introduction of code layers on Figma’s canvas and the stated aim of iterating on ideas without production-quality code.
  3. GitHub: Spec Kit releases — accessed 19 November 2026. Version 1.0.0 dated 21 August 2026.
  4. Nielsen Norman Group: Good from Afar, But Far from Good: AI Prototyping in Real Design Contexts (24 October 2025, reviewed 19 August 2026) — accessed 19 November 2026. The effect of prompt detail and design files on output, the generic character of results, and the recommended uses.
  5. Romero et al.: Usable but Conventional: An Empirical Study on the UX of AI-Generated Interface Prototypes (arXiv 2605.15124, 2026) — accessed 19 November 2026. 92 participants rating ten prototypes, five AI-generated and five human-made, with no consistent advantage for either. The participants were computing students, so treat it as indicative.
  6. Google Cloud: Introducing DORA’s inaugural AI Capabilities Model (23 September 2025) — accessed 19 November 2026. The seven capabilities, the survey of almost 5,000 respondents, and the finding on user-centric focus. The most recent edition: DORA did not run an annual survey in 2026, as reported by Waydev on 4 September 2026.
  7. Product Institute: The State of AI in Product 2026 (June 2026, updated October 2026) — accessed 19 November 2026. 309 product leaders in 40 countries, fielded April and May 2026; high-impact ratings of 50%, 45% and 17%. A self-selected sample that the report describes as a directional snapshot.
  8. Stack Overflow: 2026 Developer Survey press release (6 October 2026) — accessed 19 November 2026. More than 30,000 responses; usefulness of AI for implementation (74%) and design (50%); friction from unclear priorities (17%), inefficient workflows (15%) and insufficient time or resources (14%).
  9. InfoQ: New DORA Report Claims Strong Engineering Foundations Drive AI Return on Investment (11 May 2026) — accessed 19 November 2026. Reported content of DORA’s ROI of AI-assisted Software Development report: the verification tax.

Planning a discovery phase for 2027?

Tell us what you want to build, what you already know about your users and which decisions are still open. We will suggest how long discovery needs to be, who should take part and what you should hold at the end of it.