Home / Insights / Product Design and Discovery
Product Design and Discovery
Cutting an MVP Down to Size: A Feature Prioritisation Method That Survives Stakeholder Review
Most MVPs are not too small; they are too wide. This is the method we use to turn a long wish list into a first release that tests one idea properly, and to keep it that way when stakeholders push back.
TopicsProduct Design and DiscoverySoftware Costs and Budgets
Key takeaways
- Start from the one or two assumptions the MVP must test, not from the feature list. Every feature should earn its place against those assumptions.
- Score features on learning value, user necessity and build cost, then apply a ‘can we fake it?’ test before anything goes into scope.
- Separate ‘must exist for a user to complete the core journey’ from ‘must exist for the business to feel comfortable’. The second list is where scope creep hides.
- Write the cut list down with the reason for each cut. A visible ‘not now’ list is what makes stakeholders accept a smaller release.
- Re-run the prioritisation after the first round of user feedback; the MVP backlog is a hypothesis, not a contract.
On this page
Every MVP conversation starts with a list that is too long. Founders have been living with the idea for months, sales wants the features a prospect mentioned last week, operations wants admin screens for every edge case, and the designer has a vision for onboarding. Each item is reasonable on its own. Together they produce a first release that takes too long, costs too much and tests nothing clearly.
Prioritisation frameworks such as MoSCoW, RICE or Kano are useful, but on their own they tend to turn into negotiation tools: everything becomes a “must have”. This article sets out a method that anchors decisions to what the MVP is supposed to learn, makes the cost of each feature explicit and leaves an audit trail stakeholders can accept. It assumes you already have a rough product idea; if you are still validating whether the idea is technically possible, start with a technical feasibility review first.
Start with learning goals, not features
An MVP exists to reduce a specific risk. Before looking at features, write down the assumptions that would kill the product if they turned out to be false. Typical candidates are:
- Demand: will the target users sign up, return or pay for this?
- Workflow fit: does the product fit how users actually work, or does it require them to change habits?
- Supply or data: can you get the content, partners, data or inventory the product depends on?
- Channel: can you reach users at a cost that makes sense?
- Technical: does an integration, algorithm or AI feature work well enough in real conditions?
Pick one or two primary assumptions. Then write each as a testable statement with a signal you will measure, for example: “Care coordinators will log visit notes in the app instead of on paper, measured by the share of visits with notes recorded on the same day.” That signal tells you which user actions the analytics setup must track and, more importantly, which features are needed to produce it.
If the team cannot agree on the primary assumption, stop and resolve that first. Prioritisation without a shared learning goal becomes a contest of opinions.
Map the one journey the MVP must support end to end
Draw the shortest path a real user takes to reach the moment that produces your learning signal. For a booking product that might be: discover a provider, check availability, request a booking, receive confirmation, attend. For an internal tool: log in, see today’s tasks, complete a task, record the result.
Every step on that path needs something. It does not always need software. Then add the minimum supporting pieces the journey cannot run without: authentication, a way for your team to see and correct data, basic notifications and whatever the business legally must provide (consent, terms, data deletion requests).
Everything not on the journey or in the supporting minimum goes to a candidate list for scoring. This step alone usually removes a large part of the original list, because features such as advanced search, multiple user roles, referral schemes and dashboards rarely sit on the critical path of the first test.
Score what remains: learning, necessity and cost
For the remaining candidates, score each one from 1 to 3 on three dimensions. Keep the scale coarse; false precision invites arguments.
| Dimension | Question | Scoring guide |
|---|---|---|
| Learning value | Does this feature directly affect the signal we are measuring? | 3 = changes the signal; 2 = improves its quality; 1 = no effect |
| User necessity | Would a target user abandon the journey without it? | 3 = cannot complete; 2 = significant friction; 1 = nice to have |
| Build cost and risk | How much effort, integration and uncertainty does it add? | 3 = small and well understood; 2 = moderate; 1 = large or uncertain |
Multiply or sum the scores; either works if you are consistent. What matters is the conversation each score forces. A feature with high necessity but low learning value (password reset, for example) is in scope but should be built in the simplest possible way. A feature with high learning value but high cost is a candidate for faking.
Ask engineering for cost ranges, not estimates
At this stage, ask developers to sort features into small, medium and large, and to flag anything with unknowns: third-party APIs without sandbox access, payments, real-time features, offline mobile behaviour, or AI output quality. Unknowns cost more than size. Our MVP cost guide covers the main cost drivers in more depth.
Apply the ‘can we fake it?’ test
Before a scored feature enters the build, ask whether the learning it provides could be obtained without building it properly. Common substitutes:
| Feature on the wish list | MVP substitute | When the substitute stops working |
|---|---|---|
| Automated matching or recommendations | Staff match manually from an admin screen | When volume exceeds what one person can handle in a day |
| In-app payments | Payment links or invoicing outside the app | When payment friction is the thing you need to test |
| Self-service onboarding | Onboarding calls and accounts created by your team | When you need to test acquisition without sales effort |
| Reporting dashboards | Analytics tool plus a weekly export | When customers need reports as part of the value |
| Chat between users | Email or phone handover after a match | When off-platform leakage undermines the model |
| AI-generated content | Templates, or a human reviewing AI drafts in an admin tool | When AI quality itself is the assumption under test |
The right column matters. A substitute is a deliberate, temporary choice with a known exit condition. Write that condition down so nobody is surprised when the manual process needs replacing.
Handle stakeholder pushback with a visible cut list
Prioritisation usually fails in the review meeting, not in the spreadsheet. A few practices make the outcome stick.
Separate user needs from comfort needs
Many requests come from the business wanting to feel safe: role-based permissions for a team of three, audit logs before there is anything to audit, a full admin console. Some of these are genuine obligations, especially in regulated sectors such as healthcare or finance. Ask for each one: “Is this required by law, a contract or a real security risk, or would we simply prefer to have it?” Obligations go in; preferences go on the cut list.
Publish the ‘not now’ list
Keep a list of every deferred feature with the reason it was deferred and the signal that would bring it back. Stakeholders accept cuts more readily when they can see their request was considered, not ignored. It also becomes the starting backlog for the release after the MVP.
Trade, do not add
Once scope is agreed, a new item can only come in if something of similar size goes out. On a scoped project this is the change-control step; on a dedicated team it is simply how the backlog is managed. Either way, the trade should be explicit and recorded.
A worked example: a field service MVP
Consider an illustrative example. A company wants an app for technicians who service equipment at customer sites. The initial list includes scheduling, route optimisation, parts inventory, customer signatures, photo capture, invoicing, a customer portal, offline mode and a manager dashboard.
The primary assumption is that technicians will record job outcomes on a phone during the visit rather than on paper afterwards. The signal is the share of jobs closed in the app on the same day.
- Core journey: see today’s jobs, open a job, record outcome with photos and a signature, close the job. Scheduling is handled by the office in an admin screen.
- Scored in: photo capture and signatures (high learning and necessity), basic offline queueing for poor-signal sites (high necessity, medium cost).
- Faked: route optimisation (office plans routes as today), invoicing (export of closed jobs to the existing accounting system).
- Cut list: customer portal, parts inventory, manager dashboard, with the signals that would bring each back.
The result is a release built around a single journey, with a clear measure of whether it is working.
Frequently asked questions
How many features should an MVP have?
There is no right number. A better test is whether every feature supports the core journey or the learning signal. If you cannot explain how a feature affects what you are measuring, it probably belongs on the cut list.
Should we use MoSCoW, RICE or Kano?
Any of them can work if the team first agrees on the learning goal. Our scoring approach is a simplified version that keeps learning value explicit. For a comparison of wider frameworks, see our guide to product discovery frameworks.
What if investors expect a more complete product?
Show them the learning goal, the signal and the cut list with exit conditions. A focused MVP with a clear measurement plan is usually easier to defend than a broad one that cannot show what it proved.
Is a clickable prototype enough instead of an MVP?
A prototype can test comprehension and desirability with users before anything is built. It cannot test real behaviour over time, such as whether people come back or complete a task in the field. Many teams use both: a prototype first, then a small build.
Related reading
Continue your research
Need help cutting your feature list down to a testable first release?
Our MVP scope workshops turn a wish list into a prioritised first release with a written cut list and a measurement plan. See our MVP development service.
