Home / Insights / Dedicated Teams and Outsourcing

Dedicated Teams and Outsourcing

Working with a Vietnam Team from the US West Coast vs East Coast: Overlap Windows That Actually Work

A Vietnam team is 14 or 15 hours ahead of California and 11 or 12 hours ahead of New York. Those few hours change which overlap pattern works, who has to start early, and how you design handovers. This guide sets out the windows for each coast, what to do inside them, and how to judge the arrangement after a month.

TopicsDedicated Teams and OutsourcingBusiness Operations and IntegrationSoftware Partner Selection

Key takeaways

  • West Coast teams get the cleanest pattern: the US late afternoon (roughly 16:00–18:00 Pacific) is the Vietnam morning, so the day ends in California exactly as it starts in Hanoi. It is a handover, not a shared working day.
  • East Coast teams have a harder choice: either an early US morning (07:00–09:00 Eastern meets 18:00–20:00 Hanoi) or a shifted Vietnam schedule. Decide this before the contract, not after.
  • Vietnam has no daylight saving; the US gap changes by an hour on the second Sunday in March and the first Sunday in November, so every recurring meeting needs an agreed anchor time zone.
  • The quality of the written handover matters more than the length of the overlap. Teams that ship well across 15 hours spend the overlap on decisions and demos, not status updates.
  • Measure the first month with three numbers: questions answered within one Vietnam working day, pull request review latency, and tickets started without a clarifying question.

US companies that work with a Vietnam development team usually discover that “the time difference” is not one problem but two. A product team in Seattle or San Francisco is 14 or 15 hours behind Hanoi and ends its day as the Vietnam team arrives. A team in New York, Boston or Atlanta is 11 or 12 hours behind, which sounds easier but in practice puts the natural overlap at an awkward hour for one side or the other. The right working pattern for each coast is different, and companies that copy a colleague’s schedule from the other coast tend to end up with a team that is permanently waiting.

This article is for engineering managers, product leads and operations directors in the US who run, or are about to run, a dedicated team in Vietnam. As a PM and QA lead I have run delivery for both coasts, and the pattern below reflects what I have seen work. It covers the arithmetic for each coast across the US daylight-saving year, the overlap patterns that are sustainable for both sides, what to put inside the overlap and what to move to writing, the handover design that makes a 15-hour gap an advantage, and a one-month trial plan with metrics. On PoliteTech’s dedicated development team engagements, shared hours are agreed with the client’s time zone and the team works in the client’s own backlog and tools, so much of this is simply what we set up in the first week.

The arithmetic for each coast, across the daylight-saving year

Vietnam is on UTC+7 all year with no daylight saving. The United States changes its clocks: according to NIST, daylight saving time begins at 2am on the second Sunday in March and ends at 2am on the first Sunday in November (8 March to 1 November in 2026). That gives four different gaps depending on coast and season.

US locationSeasonUS zoneHours behind Hanoi09:00 in Hanoi is17:00 in the US is
West Coast (Pacific)March–NovemberPDT (UTC−7)1419:00 previous day07:00 next day in Hanoi
West Coast (Pacific)November–MarchPST (UTC−8)1518:00 previous day08:00 next day in Hanoi
East Coast (Eastern)March–NovemberEDT (UTC−4)1122:00 previous day04:00 next day in Hanoi
East Coast (Eastern)November–MarchEST (UTC−5)1221:00 previous day05:00 next day in Hanoi

Two things follow. First, the West Coast’s end of day lands on the Vietnam start of day, which is the ideal shape for a handover. Second, the East Coast’s working day sits almost exactly opposite Vietnam’s, so any live overlap requires one side to be at the edge of its day. Neither is bad; they call for different patterns. Note also that Arizona and Hawaii do not observe daylight saving, so a team in Phoenix has a fixed 14-hour gap all year.

The West Coast pattern: a handover, not a shared day

For a Pacific-time team the sustainable overlap is the US late afternoon. From roughly 16:00 to 18:00 Pacific, Hanoi is at 06:00–08:00 (summer) or 07:00–09:00 (winter). We typically ask the Vietnam team to start at 08:00 Hanoi on days with a scheduled overlap, which gives 90 minutes to two hours of live time without anyone working an unusual day. The US team closes its day by handing over; the Vietnam team opens its day by receiving. Vietnam’s Labour Code caps normal hours at eight a day and 48 a week with limits on overtime, as summarised by ASEAN Briefing, so a pattern that asks the Hanoi team to start at 06:00 regularly is not one a good vendor will agree to.

What a West Coast day looks like (illustrative)

  1. 07:30 Pacific: the US product owner reads the Vietnam end-of-day handover, written around 17:30 Hanoi, which was 03:30 Pacific. It lists what shipped, what is in review and what is blocked.
  2. Morning Pacific: the US side reviews pull requests, answers written questions on tickets and prepares the next day’s work. Hanoi is asleep; nothing here needs a meeting.
  3. 16:00–17:30 Pacific: live window. Stand-up (blockers only), decisions, demos of work finished overnight, pairing on anything stuck.
  4. 17:30 Pacific: the US side writes its handover: decisions made today, reprioritised tickets, answers to open questions.
  5. 09:30–17:30 Hanoi: the Vietnam team works from the backlog, with the US handover as its morning brief.

The West Coast pattern has one trap. Because the overlap is at the end of the US day, it is the first thing to be cancelled when a US afternoon fills with meetings. If the live window is skipped twice in a week, the Vietnam team has effectively been working without a product owner for two days. Treat the window as a fixed appointment, and if a US stakeholder cannot attend, send a written substitute before 16:00.

The East Coast pattern: choose who starts early

For an Eastern-time team the gap is 11 or 12 hours, which places the two working days almost exactly opposite each other. The three realistic options are:

OptionUS windowHanoi windowWho stretchesWhen it works
Early US morning07:00–09:00 Eastern18:00–20:00 (summer) / 19:00–21:00 (winter)Both: US starts early, Hanoi finishes lateTwo or three fixed days a week, not daily
Shifted Vietnam day07:30–09:30 EasternTeam works 11:00–19:30 HanoiVietnam team, by contractWhen daily live contact matters more than a standard local day; agree it in the contract with the vendor
Late US evening20:00–21:30 Eastern07:00–08:30 (summer) / 08:00–09:30 (winter)US sideFounders or leads who prefer evenings; rarely sustainable for a whole US team

In our experience the first option works for most East Coast clients when it is limited to two or three days a week with a fixed agenda, and the other days run asynchronously. The shifted Vietnam day is worth considering for discovery phases or for a dedicated team that will be with you for years, because it gives a daily window at a civilised hour for the US. It should be agreed in writing with the vendor so the team is hired and paid for that schedule rather than quietly expected to stay late.

Microsoft’s Work Trend Index report on the infinite workday (June 2025) found that meetings starting after 8pm were up 16% year on year and that nearly a third of meetings span multiple time zones. The East Coast pattern is where this risk is highest. A 20:30 Eastern stand-up feels fine for a month and corrosive after six. If you choose the late-evening option, limit it to one or two people and keep it to 30 minutes.

What belongs inside the overlap, and what belongs in writing

With both coasts the overlap is short, so its contents must be chosen. The rule we use is that live time is for anything that needs several people to think together, and writing is for everything else. GitLab’s guide to asynchronous working lists the cases where going synchronous is right: urgent matters and incidents, live troubleshooting, when async has stalled, creative brainstorming and relationship building. Status updates are not on that list, and they should not be in your overlap either.

Inside the live window

  • Decisions that need the product owner and the tech lead together, with the outcome written on the ticket before the call ends.
  • Demos of finished work, so acceptance happens while both sides are present.
  • Pairing on something genuinely stuck for more than one Vietnam working day.
  • Ten minutes of conversation that is not about work. Distributed teams that never talk informally handle conflict badly.

In writing, before the other side wakes up

  • Tickets that are complete enough to start without a question: goal, acceptance criteria, designs, constraints. A “ready” column that only the product owner can fill is the simplest enforcement.
  • Pull request reviews. For the West Coast, reviews written in the US morning are waiting when Hanoi arrives; for the East Coast, reviews written by the US end of day are waiting at the Hanoi start. Either way, the target is that no pull request waits more than one working day on the other side.
  • Questions with a default. When the Vietnam team asks something in writing, they also state what they will do if there is no answer by a stated time. That converts a blocking question into a reversible choice.
  • The end-of-day handover from each side, covered next.

GitLab’s checklist for an async message is a good standard for all of these: does the recipient have the context, is the message clear, are next steps and resources included, and is it documented where it can be found later.

Designing the handover so 15 hours becomes an advantage

The reason a West Coast team can genuinely get a longer product day out of a Vietnam team is that the two working days barely touch, so work can pass between them like a baton. That only happens if the baton is well made. In practice the handover is a short written note from each side at the end of its day, in the same place every time (a pinned channel, a daily page in the wiki, or a comment on the sprint board). The format we use has four headings:

  1. Done: what was finished, with links to the pull requests or builds. For a QA team, which test suites ran and what they found.
  2. In progress: what will continue tomorrow and roughly how far along it is.
  3. Blocked or waiting: what cannot move without the other side, and what exactly is needed. This is the most important section; a vague “waiting for feedback” wastes a day.
  4. Decisions and changes: anything that changed today that the other side needs to know before it starts.

Two rules make this work. First, each side writes its handover before leaving, not the next morning; a handover written in the morning arrives after the other side has already started guessing. Second, the handover is read before the first meeting of the day, and the first meeting starts from it. On teams where I have seen this done consistently, the morning reconstruction time (figuring out what happened overnight) falls from an hour to ten minutes.

Deployment windows and incidents

Decide deployment windows with the gap in mind. For a West Coast client, deploying at the end of the Hanoi day (around 17:00 Hanoi, which is 03:00 Pacific in summer) means a problem is discovered by the US team at 07:30 with nobody in Vietnam awake to help. Deploying at the end of the US day instead means Hanoi sees the result within an hour. For an East Coast client, deploying in the overlap window itself is usually the safest choice. Whichever you pick, write down who can roll back during the hours the other side is asleep, and if the vendor is expected to be on call outside its working day, put that in the contract with its own hours and rates. Our guide on measuring a dedicated team covers how to track incident response without distorting behaviour.

Clock changes, holidays and the calendar maintenance nobody owns

Because Vietnam does not move its clocks and the US does, every recurring meeting anchored to a US time zone moves by an hour for the Vietnam team twice a year, and vice versa. In March the gap shrinks by an hour; in November it grows. A 16:30 Pacific stand-up that was 07:30 Hanoi in summer becomes 08:30 in winter, which is fine; a 07:00 Eastern call that was 18:00 Hanoi in summer becomes 19:00 in winter, which may not be. Assign one person to review the schedule in the week of each change, and record in the team charter which side the meeting is anchored to.

Holidays are the second calendar problem. Vietnam’s Lunar New Year (Tet) falls in late January or February and typically closes offices for a week or more, plus national days in April, May and September. US federal holidays are different again, and the week between Christmas and New Year is quiet on the US side but a normal working week in Hanoi. Load both calendars into the planning tool for the next twelve months in the first week, and plan sprint boundaries around Tet rather than discovering it in week one of a release.

The UK version of this guide has a shorter gap and a very different overlap shape; if your company has teams on both sides of the Atlantic working with the same Vietnam team, it is worth reading both and agreeing a single anchor time zone for shared ceremonies.

A one-month trial plan with metrics

Whatever pattern you choose, treat the first four weeks as a measured trial. These are the items I ask clients to confirm before the first sprint and the numbers we watch.

Before day one

  • Overlap pattern chosen for your coast and written down with both the summer and winter versions.
  • A named owner for the clock-change review and the shared holiday calendar.
  • Repositories, CI and cloud accounts in your organisation, with vendor engineers added as members under role-based access. Our 90-day onboarding plan covers the access and first-task sequencing.
  • A handover template agreed and pinned where both sides will see it.
  • A definition of “ready” for tickets, and a definition of who can approve pull requests on the Vietnam side.

Weeks one to four

  • Handovers written by both sides every working day, checked for completeness by the delivery lead.
  • Live window held as scheduled; any cancellation replaced by a written substitute the same day.
  • Retrospective at the end of week two and week four specifically on the time-zone practices.

Metrics

MetricWhat it showsIllustrative target
Questions answered within one Vietnam working dayWhether the US side is responsive in writingAbove 90%
Pull request review latencyThe main hidden cost of the gapUnder one working day on the reviewing side
Tickets started without a clarifying questionQuality of specs and the product briefRising week on week
Live windows held as scheduledWhether the overlap is being protectedAll of them, or a written substitute

If the numbers are healthy after a month, the pattern fits your coast. If they are not, the usual cause is on the US side’s writing and availability rather than in Hanoi, and the usual fix is to move more of the day into the handover and less into the meeting. For a different buyer’s perspective on the same vendor market, our guide for Australian companies covers a time zone with almost no gap at all.

Frequently asked questions

Which US coast is easier for working with Vietnam?

The West Coast has the cleaner shape: its late afternoon is the Vietnam morning, so the day hands over naturally. The East Coast has fewer hours of difference but the working days sit opposite each other, so someone has to be at the edge of their day for any live window. Both work; they need different patterns.

How much live overlap do we actually need?

Less than most teams assume. Ninety minutes to two hours on scheduled days is enough for decisions, demos and unblocking if tickets are complete and handovers are written daily. Teams that try to recreate a shared office day across 15 hours burn out one side.

Should we ask the Vietnam team to work US hours?

Not a full US day. A partial shift (for example 11:00–19:30 Hanoi for East Coast clients) can be agreed in the contract so the team is hired for that schedule. Asking a team hired for standard hours to stay late informally is unsustainable and is not something a reputable vendor should accept.

What about daylight saving?

Vietnam does not observe it; the US does, from the second Sunday in March to the first Sunday in November. The gap changes by an hour twice a year, so record which side each recurring meeting is anchored to and review the schedule in the week of each change.

Who handles a production incident when the other side is asleep?

Decide before it happens. Options are a US-side engineer who can roll back, an on-call arrangement written into the vendor contract with its own hours and rates, or deployment windows placed so problems surface while both sides are awake.

How long until the arrangement feels normal?

In my experience teams with complete tickets and daily handovers settle within the first sprint; teams that rely on calls take a month or more. Measure the first four weeks rather than judging by how the stand-up feels.

Sources and methodology

Guidance reflects PoliteTech delivery experience. The external references below informed specific points in this article.

  1. NIST: Daylight Saving Time (DST) — accessed 10 November 2026. US DST start and end rules (second Sunday in March, first Sunday in November; 8 March to 1 November 2026) and the states that do not observe it, used for the gap table.
  2. ASEAN Briefing: Working Hours and Overtime Regulations in Vietnam (July 2025) — accessed 10 November 2026. Vietnam Labour Code limits of eight hours a day and 48 hours a week with capped overtime, cited when discussing shifted schedules.
  3. GitLab Handbook: The complete guide to asynchronous and non-linear working — accessed 10 November 2026. The list of situations where synchronous communication is justified, and the checklist for a well-formed asynchronous message.
  4. Microsoft WorkLab: Breaking down the infinite workday (Work Trend Index special report, 17 June 2025) — accessed 10 November 2026. The 16% year-on-year rise in meetings after 8pm and the share of meetings spanning time zones, used to warn against late-evening East Coast patterns.

Which overlap pattern fits your coast and your product?

We can map the shared hours, the handover routine and the deployment windows for your team before you commit, and agree the schedule in the contract rather than by assumption.