The 2027 Project Kickoff Checklist: What to Settle in the First Two Weeks When AI Agents Are on the Team
New models from OpenAI, Google and Microsoft landed in the week of 17 November, and most teams starting work in January will have coding agents switched on from day one. That makes the first two weeks decisive. Here is the kickoff checklist I use: eight areas, a two-week plan, the 2027 compliance dates to put on the roadmap and a ten-gate readiness scorecard.
TopicsQA and Software TestingDedicated Teams and Outsourcing
Key takeaways
- Three model releases in the week of 17 November (GPT-6.2, MAI Code 2, Gemini 4 Neon) mean January teams will start with agents on. Decide how they are used before the first ticket, not after.
- DORA 2025: 90% of respondents use AI at work, but AI adoption still has a negative relationship with delivery stability. Kickoff is where you build the verification that offsets it.
- Run the first two weeks in three blocks (align, set up, plan) and require one trivial change to travel the full pipeline by day seven.
- Put the 2027 EU dates on the plan with owners: CRA reporting (live since 11 September 2026), CRA main requirements (11 December 2027), and the AI Act and accessibility duties that apply to your product.
- Score ten gates on day ten. No release date while any gate is red.
On this page
- Why kickoff matters more in 2027
- How to use this checklist
- 1. Outcomes, scope and decision rights
- 2. AI and agent policy
- 3. Quality plan and Definition of Done
- 4. The 2027 compliance calendar
- 5. Calendar, capacity and estimates
- 6. Reporting, risk and change control
- 7. Access, continuity and exit
- 8. The kickoff readiness scorecard
- Frequently asked questions
- Sources and methodology
Most projects that go wrong in their third month were already going wrong in their first fortnight. The scope was a sentence, nobody owned acceptance, the test environment arrived late and the first release date was set before anyone had looked at the calendar. In 2027 there is a new way to fail early: the team starts with coding agents switched on and nobody has agreed what they may touch, who checks their work, or what “done” means when half the pull requests were not typed by a person.
January is when a lot of new work starts, which makes late November the right moment to prepare. This is the kickoff checklist I use as PM-QA Lead at PoliteTech for projects starting in the new year. It is written for the client-side decision-maker: the product owner, the head of engineering or the operations lead who has signed the budget and wants the first two weeks to produce a plan that will survive contact with real delivery. It sits alongside our planning checklists and the Project Estimator, and it assumes you have already done, or decided to skip, a discovery phase.
Why kickoff matters more in 2027
The tools your team will use in January changed again this month. In the week of 17 November, three vendors shipped models aimed directly at everyday software work:
- OpenAI introduced GPT-6.2 Astra and Sol, a frontier model for demanding projects and an efficient everyday model, available across ChatGPT, Codex and the API.
- Microsoft AI released MAI Code 2 and MAI Code 2 Flash on 17 November, two coding models for enterprise tasks, both available in GitHub Copilot.
- Google introduced Gemini 4 Neon on 18 November, positioned for complex software engineering with a one-million-token context window.
None of this is a reason to plan around a particular model. It is a reason to write down, at kickoff, how the team will adopt and swap models without disrupting delivery, because the line-up will change again before your first release. Adoption itself is no longer the question. The 2025 DORA report, based on nearly 5,000 technology professionals, found that 90% of respondents use AI at work and more than 80% believe it has increased their productivity. Stack Overflow’s look back at its survey data shows reported use of AI agents rising from 31% in the 2025 survey to 59% in an April 2026 pulse survey.
What has not caught up is verification. DORA found that 30% of respondents report little or no trust in AI-generated code, and that while AI adoption now has a positive relationship with delivery throughput, it continues to have a negative relationship with delivery stability. In Stack Overflow’s 2025 results, trust in the accuracy of AI tools fell to 29%, and the top frustration, cited by 45% of developers, was AI solutions that are almost right, but not quite. DORA’s summary is the line I repeat at every kickoff: AI does not fix a team, it amplifies what is already there.
The commercial side is moving too. In September Gartner predicted that by 2028, 70% of enterprises will abandon agentic AI built by vendor forward-deployed engineering, citing soaring costs and an inability to evolve it themselves, and noted that such engagements often fail structurally before they fail technically. Structural failure is exactly what a kickoff is for: ownership, governance, change control and the ability to carry on without the people who built it.
How to use this checklist
The checklist is organised into eight areas. Each item has an owner and a test: you are not done when it is discussed, you are done when the artefact exists and the named person has accepted it. I run the first two weeks in three blocks.
| Block | Days | Focus | Exit gate |
|---|---|---|---|
| Align | 1–3 | Outcomes, scope boundaries, decision rights, AI and agent policy | Signed one-page charter and approval matrix |
| Set up | 4–7 | Environments, access, test strategy, Definition of Done, compliance calendar | First change merged and deployed to a test environment through the agreed pipeline |
| Plan | 8–10 | Release plan, capacity, risks, reporting, exit and continuity | Release plan with dates the team has checked against its own calendar and review capacity |
The gate in the middle block matters most. A trivial change that travels the full path, from ticket to reviewed pull request to automated tests to a deployed test environment, exposes missing access, broken pipelines and unclear approvals while they are still cheap to fix. If that change cannot be shipped by day seven, the release plan you write on day ten is fiction.
1. Outcomes, scope and decision rights
Agents make scope cheaper to expand, which makes the boundary more important, not less. An agent asked to fix a form can also refactor the validation library, update three dependencies and rename an API field. Each change may be reasonable; together they are unplanned scope. Write the boundary down before the first ticket.
- Three measurable outcomes for the first release, each with a baseline and a target, owned by a named client-side person. “Launch the portal” is not an outcome; an illustrative one would be “cut average claim intake time from 12 minutes to 5”.
- An explicit out-of-scope list. It is the most useful page in the charter, because it is the one people check when a request arrives.
- A single product owner with authority to accept work, plus a named deputy for holidays. Acceptance by committee is how releases slip.
- An approval matrix by risk tier: which changes can merge with automated checks only, which need one reviewer, which need a senior engineer and which need a client decision. I set out the tiers in our 2027 delivery working agreement.
- A change control rule that covers both people and agents: any change to scope, data handling, user-facing behaviour or cost goes through the same request, whoever or whatever proposed it.
2. AI and agent policy
The first capability in DORA’s AI Capabilities Model is a clear and communicated AI stance. In practice that is a one-page policy agreed at kickoff, not a paragraph buried in the master services agreement. It should answer six questions.
| Question | What to decide | Owner |
|---|---|---|
| Which tools? | Named agents and models allowed on this project, with a fallback for each, and how a new model is approved mid-project | Vendor delivery lead, approved by client |
| Where may they act? | Repositories, branches and environments agents may write to; production is normally read-only or off-limits | Client security owner |
| With what data? | What client code, documents and data may be sent to which model provider and region; whether training on it is excluded contractually | Client data protection owner |
| Who is accountable? | Every agent change has a named human author who can explain it; the reviewer is never the person who prompted it | Vendor tech lead |
| What does it cost? | Who pays for model usage, the monthly ceiling, and the alert threshold | Client budget holder |
| How is it recorded? | Agent identity on commits and pull requests, so throughput and rework can be measured by source | Vendor delivery lead |
The other six DORA capabilities read like a kickoff agenda: healthy data ecosystems, AI-accessible internal data, strong version control practices, working in small batches, user-centric focus and quality internal platforms. If your project starts without small batches and solid version control, adding agents will make the instability DORA measured more likely, not less.
3. Quality plan and Definition of Done
This is where I spend most of the first week, because it is where AI-assisted projects either earn trust or lose it. When a lot of code arrives quickly, the scarce resource is verification: review time, test environments, test data and people who understand the domain well enough to say a result is wrong. Stack Overflow’s “almost right” finding is a quality-plan problem, and it is solved by deciding up front what evidence a change needs before it counts as done.
The quality items to settle
- Test strategy on one page: what is tested at unit, integration, end-to-end and exploratory level, which of those agents may write and run, and which a person must design. My view on the split is in AI Test Runners in 2027.
- Acceptance criteria written before build, in testable language, for every story in the first release. Agents are good at satisfying the letter of a vague ticket.
- Environments and test data: at least one stable shared test environment by day seven, and a policy for synthetic or masked data so real personal data never reaches a test system or a model prompt.
- Accessibility target: normally WCAG 2.2 level AA, tested with automated checks and with a screen reader on the critical journeys. For EU-facing products the European Accessibility Act makes this a legal requirement, not a nice-to-have.
- Non-functional budgets: page load, API latency, error rate and availability targets with the measurement method agreed, so performance is tested from the first sprint rather than discovered at launch.
- Defect severity definitions and a release bar: for example, no open critical or high defects, and medium defects only with a named owner and date.
A Definition of Done that survives agents
| Criterion | Evidence required |
|---|---|
| Reviewed | Approved by a named reviewer who did not prompt the change; reviewer can explain the change in two sentences |
| Tested | New behaviour covered by tests that fail without the change; full suite green |
| Accepted | Acceptance criteria demonstrated to the product owner on a test environment |
| Accessible | Automated accessibility checks pass; critical journeys checked with a screen reader |
| Traceable | Linked to its ticket, with the agent or tool that produced it recorded |
| Releasable | Deployed behind a flag or with a rollback path tested |
4. The 2027 compliance calendar
Regulation is the part of kickoff most teams leave to legal and then rediscover during release planning. For any product sold into the EU, several dates now fall inside a typical 2027 project, and each one turns into concrete delivery work: a process, a test, a document or a release gate. This is not legal advice; confirm how each rule applies to your product with counsel. What a PM-QA lead can do is make sure every date is on the plan with an owner.
| Rule | Date | What it means for delivery |
|---|---|---|
| Cyber Resilience Act: reporting | Applies to manufacturers since 11 September 2026 | Actively exploited vulnerabilities and severe incidents must be reported: an early warning within 24 hours, a notification within 72 hours and a final report later, through ENISA’s Single Reporting Platform. Your incident runbook needs a named reporter and a clock. |
| Cyber Resilience Act: main requirements | From 11 December 2027 | Security requirements for products with digital elements apply. A project starting in January 2027 that ships into the EU will be in market when they bite, so plan vulnerability handling, SBOMs and update support now. |
| Product Liability Directive | Products placed on the market after 9 December 2026 | Software is treated as a product for liability purposes. See our release readiness checklist for what to keep as evidence. |
| EU AI Act: Article 50 transparency | From 2 August 2026 | Disclosure duties for AI systems that interact with people, such as chatbots, apply. Our CTO covered the architecture in a separate article. |
| EU AI Act: marking of AI-generated content | Grace period to 2 December 2026 under the Digital Omnibus agreement | Machine-readable marking of generated output; check the final text for which systems the grace period covers. |
| EU AI Act: high-risk systems | 2 December 2027 (Annex III) and 2 August 2028 (Annex I) under the Digital Omnibus agreement | If your use case may be high-risk, the risk management, data governance and documentation work belongs in the 2027 roadmap, not after it. |
| European Accessibility Act | Applies since 28 June 2025 | Accessibility of covered products and services is a legal requirement; build it into the Definition of Done. |
Two notes on the AI Act rows. The new high-risk dates come from the provisional Digital Omnibus agreement reported in May 2026 by Gibson Dunn and Hogan Lovells; both described formal adoption as a remaining step, so check the text published in the Official Journal before relying on them. And the firms differ on the scope of the watermarking grace period, which is another reason to give one person the job of confirming each date against the final text. The CRA timings come from the European Commission’s CRA reporting page.
The kickoff deliverable is simple: a one-page register listing each rule that applies, the date, the work item it creates, the owner and the sprint in which the evidence will exist.
5. Calendar, capacity and estimates
The most common planning error I see in January kickoffs is a release date set from the calendar on the wall rather than the team’s working calendar. For a team in Vietnam, Lunar New Year falls in February 2027 and takes most of a week or more out of delivery, with a slower ramp either side; the dates and our planning approach are in our 2027 working calendar. Client-side holidays and change freezes count too: if your business freezes releases in the last weeks of a quarter, that freeze belongs on the plan.
- Plan review capacity, not just build capacity. When agents raise the volume of changes, review becomes the constraint. Agree how many reviewer hours per week exist and plan the release against that number.
- Re-estimate after the day-seven gate. The first end-to-end change gives you real data on pipeline time, review time and environment friction. Use it to correct the plan before you publish dates. Our 2027 estimating guide explains why the verification line now matters more than the coding line.
- Hold a buffer you can name. I keep it as a visible line in the plan, with a rule for who may spend it, rather than hiding it inside estimates.
- Book client time. Acceptance sessions, data access approvals and security reviews need people on the client side. Put them in calendars in week one.
6. Reporting, risk and change control
Agree the reporting format at kickoff and the first report should be boring. I use a weekly one-page report with the same sections every week, so the client can see trends instead of reading prose.
- Progress against the release plan, as completed and accepted stories, not effort spent.
- Throughput and stability side by side: changes shipped, changes reverted or reworked, and escaped defects. DORA’s finding that AI helps throughput but hurts stability is the reason to show both on the same page.
- Review queue: open pull requests and median time waiting for review, split by human and agent authorship.
- Agent and cloud spend against the agreed ceiling.
- Top five risks from the RAID log (risks, assumptions, issues, dependencies), each with an owner and next action.
- Decisions needed from the client this week, with a date by which each is needed.
The RAID log itself is a kickoff artefact. Seed it in the first workshop with the risks everyone already knows about: dependency on a third-party API, an unproven data migration, a key client person going on leave. The risks you write down in week one are the ones you can still do something about.
7. Access, continuity and exit
Gartner’s warning about agentic systems that enterprises cannot evolve on their own is, at bottom, a continuity problem. The answer starts on day one, not at handover.
- The client owns the accounts: repositories, cloud subscriptions, domains, app store accounts and model provider keys sit in client-owned organisations, with the vendor invited as members.
- Agents get their own identities with least-privilege access, and secrets stay in a vault rather than in prompts, configuration files or chat history.
- The repository is the record: architecture decisions, runbooks, prompts and agent configuration are committed alongside the code, so knowledge does not live in one person’s tool history.
- A named fallback for every tool, so a pricing change, acquisition or model retirement does not stop delivery.
- Support after launch is agreed before build: response times, patching commitments and who handles CRA reporting once the product is live. Our Software Maintenance terms and our article on patching at machine speed cover what to ask for.
8. The kickoff readiness scorecard
On day ten I score the project against ten gates with the client. Green means the artefact exists and its owner has accepted it. Amber means it exists but has an open question with a date. Red means it does not exist. My rule: no published release date while any gate is red, and no more than three ambers.
| # | Gate | Green when |
|---|---|---|
| 1 | Outcomes | Three measurable outcomes with baselines and owners |
| 2 | Scope | In-scope and out-of-scope lists signed by the product owner |
| 3 | Decision rights | Approval matrix by risk tier agreed, including agent changes |
| 4 | AI and agent policy | Tools, data rules, accountability and budget on one page |
| 5 | Quality plan | Test strategy, Definition of Done, accessibility target and release bar agreed |
| 6 | Environments | First change deployed end to end through the agreed pipeline |
| 7 | Compliance register | Each applicable rule has a date, work item and owner |
| 8 | Calendar and capacity | Holidays, freezes and reviewer hours reflected in the plan |
| 9 | Reporting and risk | Weekly report template agreed; RAID log seeded |
| 10 | Continuity | Client-owned accounts, agent identities and support terms in place |
This scorecard is also the simplest way to compare vendors before you sign. Ask each candidate to show you how they would get to green on all ten in two weeks, and what they would need from you to do it. The answers tell you more about delivery maturity than a slide on velocity. It is how we run kickoffs at PoliteTech, as described in How We Work and our Engineering Practices, and it is where our QA and Testing team joins a project: on day one, not in the last sprint.
Frequently asked questions
Is two weeks realistic for a kickoff?
For a team of up to about ten people working on a defined product, yes, provided client-side decision-makers are available. Larger programmes need longer, but the same gates apply; split the scorecard by workstream rather than stretching the timeline without gates.
Do we need a discovery phase before this?
If the problem, users and core flows are not yet clear, run discovery first: this checklist assumes you know what you are building and need to set up delivery. If discovery is done, its outputs feed gates 1, 2 and 5 directly.
Should coding agents be switched off until the kickoff is complete?
Not necessarily, but limit them to the lowest risk tier and to non-production branches until gates 3 and 4 are green. Letting agents work before decision rights and data rules exist is how unplanned scope and data exposure start.
Who should own the compliance register?
A named person on the client side who can reach legal counsel, supported by the vendor’s PM-QA lead who turns each rule into work items and evidence. The register is a delivery tool; it does not replace legal advice.
What if a gate is still red on day ten?
Do not publish a release date. Publish the date by which the gate will be green and what is blocking it. A late, honest date is worth more than an early one the team does not believe.
Sources and methodology
Every figure in this article was checked in the source listed here. Vendor announcements are reported as the vendor describes them, not as independent findings. Regulatory dates are summarised for planning purposes and are not legal advice; the AI Act dates reflect the Digital Omnibus agreement as reported by the law firms cited, so confirm them against the final published text. The two-week plan, checklist items and readiness scorecard describe PoliteTech’s own practice and are offered as recommendations, not as findings from these sources.
- OpenAI: Introducing GPT-6.2 Astra and Sol — accessed 24 November 2026; supports availability of the new models across ChatGPT, Codex and the API.
- Microsoft AI: MAI Code 2 and Code 2 Flash (17 November 2026) — accessed 24 November 2026; supports release date and GitHub Copilot availability.
- Google: Introducing Gemini 4 Neon (18 November 2026) — accessed 24 November 2026; supports release date, software engineering positioning, one-million-token context.
- Google Cloud: Announcing the 2025 DORA report — accessed 24 November 2026; supports 90% AI use, more than 80% productivity, 30% little or no trust, throughput and stability relationships, nearly 5,000 respondents, the amplifier finding.
- Google Cloud: Introducing the DORA AI Capabilities Model — accessed 24 November 2026; supports the seven capabilities, including a clear and communicated AI stance.
- Stack Overflow Blog: 2025 Developer Survey results — accessed 24 November 2026; supports trust in AI accuracy at 29%; 45% frustrated by almost-right AI solutions.
- Stack Overflow Blog: A look back on Developer Survey findings (30 September 2026) — accessed 24 November 2026; supports AI agent use of 31% in 2025 and 59% in an April 2026 pulse survey.
- Gartner press release (29 September 2026) — accessed 24 November 2026; supports prediction that 70% of enterprises will abandon agentic AI built by vendor forward-deployed engineering by 2028, and the structural failure point.
- ENISA: The CRA Single Reporting Platform is launched (11 September 2026) — accessed 24 November 2026; supports CRA reporting obligations from 11 September 2026; main requirements from 11 December 2027.
- European Commission: CRA reporting obligations — accessed 24 November 2026; supports 24-hour early warning, 72-hour notification and final report timings.
- Gibson Dunn: EU AI Act Omnibus Agreement (27 May 2026) — accessed 24 November 2026; supports Annex III and Annex I high-risk dates, Article 50 from 2 August 2026, watermarking grace period, adoption status at that date.
- Hogan Lovells: EU legislators agree to delay for high-risk AI rules (7 May 2026) — accessed 24 November 2026; supports high-risk dates and remaining adoption steps.
- W3C: Web Content Accessibility Guidelines (WCAG) 2.2 — accessed 24 November 2026; supports the accessibility standard referenced in the quality plan.