Home / Insights / Architecture and Modernization

Architecture and Modernization

DORA Compliance for Fintech Software: What Vendors and In-House Teams Must Prepare

DORA has applied since January 2025, and supervisors now expect evidence rather than intentions. This guide translates the regulation into engineering and contracting work for fintech product teams and the software vendors who support them.

TopicsArchitecture and ModernizationSoftware Partner Selection

Key takeaways

  • DORA places accountability on the financial entity’s management body, but most of the evidence it needs is produced by engineering teams and their ICT vendors.
  • Major incident reporting runs on tight clocks: an initial notification within four hours of classifying an incident as major and no later than 24 hours after becoming aware of it, then intermediate and final reports.
  • Every ICT contract must be captured in a register of information, and contracts supporting critical or important functions need richer terms, including audit rights, service levels and exit support.
  • Vendors should prepare a DORA pack in advance: asset and dependency inventories, incident runbooks, logging and backup evidence, subcontractor lists and a tested exit plan.
  • Treat DORA as architecture work: observability, recoverability and portability are cheaper to design in than to retrofit before a supervisory review.

The Digital Operational Resilience Act (Regulation (EU) 2022/2554) has applied to EU financial entities since 17 January 2025. For many fintech firms, the first year was about policies, gap assessments and registers. By mid-2026 the questions have become more specific: can you show how a major incident would be classified within hours, which suppliers support each critical function, and how you would exit a provider without stopping service?

Those questions land on engineering. A payments start-up, an e-money institution or a lending platform cannot answer them without its product teams, and neither can the software vendors who build and run parts of their stack. This article is written for CTOs, heads of engineering and procurement leads at fintech firms, and for technology suppliers serving them. It is not legal advice; your compliance and legal teams should interpret the regulation for your licence type.

What DORA actually asks of fintech software

According to EIOPA’s DORA overview, the regulation sets harmonised rules on ICT risk management, ICT third-party risk, incident reporting, resilience testing and information sharing, and it creates an oversight framework for critical ICT third-party providers. It is supplemented by a set of Level 2 measures: regulatory and implementing technical standards on the ICT risk management framework, incident classification and reporting, threat-led penetration testing, ICT third-party policy, subcontracting and the register of information.

The five areas, in engineering terms

  • ICT risk management: a documented framework covering identification of ICT assets and dependencies, protection, detection, response, recovery, backup and learning from incidents.
  • Incident management and reporting: a process to detect, classify and report major ICT-related incidents to the competent authority within fixed time limits.
  • Digital operational resilience testing: a risk-based testing programme ranging from vulnerability scanning to advanced threat-led penetration testing for entities identified as mature and significant enough.
  • ICT third-party risk: a strategy for suppliers, a register of all ICT contractual arrangements, mandatory contract terms and exit strategies.
  • Information sharing: voluntary arrangements to exchange cyber threat intelligence.

Proportionality matters

DORA is not identical for every firm. The recitals of the regulation on EUR-Lex explain that certain smaller entities, such as small and non-interconnected investment firms and some exempted payment and e-money institutions, follow a simplified ICT risk management framework, and that advanced threat-led testing applies only to entities identified for it. Your first action is to confirm, with compliance, which regime applies to each licensed entity in your group.

Who carries which obligation: entity, in-house team and vendor

The regulation is addressed to financial entities, and their management bodies remain ultimately responsible for ICT risk. The recitals describe the management body’s role as pivotal and active. Software vendors and cloud providers are not usually directly supervised, unless they are designated as critical. In November 2025, the European Supervisory Authorities published the first list of designated critical ICT third-party providers, using data from financial entities’ registers of information. A typical development partner will not be on that list, but it will feel DORA through its clients’ contracts, questionnaires and audits.

Obligation areaFinancial entity (accountable)In-house engineeringICT vendor or development partner
ICT risk frameworkApproves and owns the framework; management body oversightImplements controls, keeps asset and dependency inventoriesFollows client policies; documents its components and dependencies
Incident reportingClassifies and reports to the competent authorityDetects, triages and supplies facts for reportsNotifies the client promptly and supports investigation under contract
Resilience testingSets the programme and scope; runs TLPT where requiredRuns scans, tests, recovery drillsParticipates in tests and fixes findings in its scope
Third-party riskMaintains the register, assesses concentration risk, negotiates termsIdentifies every external service the product depends onAccepts required contract terms, discloses subcontractors
Exit strategyDefines and tests exit plans for critical servicesKeeps systems portable and documentedProvides data return, transition support and documentation

The practical lesson for vendors is that DORA readiness becomes a sales and retention question. Clients will choose suppliers who can answer due-diligence questionnaires quickly and accept the contract terms the regulation requires.

Building the ICT risk management framework into the product

Policies describe intent; supervisors increasingly ask for evidence that the controls operate. For a product team, the framework becomes concrete in four capabilities.

1. An inventory that matches reality

You need a maintained list of ICT assets, information assets and their dependencies, linked to the business functions they support. Spreadsheets drift. Derive the inventory from infrastructure as code, service catalogues and cloud account tagging, then reconcile it on a schedule. Tag every service with the business function it supports, so that you can answer which systems underpin a critical or important function.

2. Detection and logging that support classification

Incident classification depends on facts: how many clients were affected, how long a service was unavailable, whether data was lost or exposed, and which geographies were involved. Design logging and metrics so those facts are available within minutes. In practice that means structured logs with correlation identifiers, service-level indicators per critical journey (payment initiation, login, card authorisation) and a way to estimate affected customers from telemetry rather than guesswork.

3. Backup, restore and recovery targets

DORA expects backup policies and recovery procedures that are tested. Set recovery time and recovery point objectives per critical function, and prove them with restore drills rather than by checking that backup jobs ran. Our guide to choosing RTO, RPO and a recovery strategy covers the trade-offs.

4. Change and access control

Change management, segregation of duties and privileged access are long-standing audit topics, and DORA keeps them central. Pipelines should record who approved a change, which tests ran and what was deployed. Production access should be time-bound and logged.

CapabilityMinimum viable evidenceMature evidence
Asset inventoryReviewed spreadsheet linked to functionsGenerated from IaC and tags, reconciled automatically
DetectionUptime checks and centralised logsSLIs per critical journey, alert routing, affected-client estimates
RecoveryDocumented backups with an annual restore testScheduled restore drills with measured RTO and RPO
Change controlPull-request approvalsPipeline attestations linked to tickets and test results

If your platform has accumulated debt in these areas, prioritise the items that block evidence for critical functions first. Our article on prioritising technical debt in a live product describes a way to fund that work without stopping feature delivery.

Incident classification and reporting: designing for the clock

The reporting timelines are where weak tooling shows. Commission Delegated Regulation (EU) 2025/301, published on EUR-Lex, sets the time limits for major ICT-related incidents:

  • Initial notification: as early as possible and within four hours of classifying the incident as major, but no later than 24 hours from becoming aware of it.
  • Intermediate report: at the latest within 72 hours of the initial notification, with an update once regular activities have been recovered.
  • Final report: no later than one month after the latest intermediate report.

The recitals also note that payment-related incidents previously reported under PSD2 now move to this regime, so payment institutions should retire parallel processes deliberately rather than run two.

What engineering must provide

  1. Fast triage data: a dashboard or query set that shows affected services, duration, estimated affected clients and transaction volumes for any incident window.
  2. A classification worksheet: criteria from the classification standard translated into questions on-call engineers can answer, with thresholds pre-filled by compliance.
  3. Roles and hand-offs: who declares an incident, who classifies, who drafts, who approves and who submits. Drill it outside office hours.
  4. Vendor notification terms: contracts should require suppliers to notify you quickly and share the facts you need. A vendor that tells you about an outage after two days makes your deadline impossible.
  5. Templates and evidence capture: pre-built report templates and an incident timeline that records decisions with timestamps.

A worked example (illustrative)

For example, a 40-person payments firm might discover at 02:10 that card authorisations are failing for a subset of merchants because a third-party fraud-scoring API is timing out. If its telemetry can show within 30 minutes how many merchants and transactions are affected, the on-call lead can complete the classification worksheet, the compliance officer can decide by 04:00 whether it is major, and an initial notification can go out well inside the four-hour window. If the same firm has to reconstruct volumes from database queries the next morning, it is already at risk of breaching the outer limit. The difference is not effort on the night; it is design work done months earlier.

Actions

  • Run a timed tabletop exercise for one critical journey, starting from a realistic alert, and measure how long classification takes.
  • Add vendor notification time limits to every contract supporting a critical function.

Contracts, the register of information and exit plans

Third-party risk is where vendors feel DORA most directly. The regulation’s recitals explain that every financial entity must keep a register of all contractual arrangements for ICT services, which supervisors can request in full or in part.

Contract terms for all ICT services

The recitals of the regulation summarise the core contractual rights: a clear description of services and functions, the locations where data is processed, service levels, provisions on data availability, integrity and protection, return of data if the provider becomes insolvent or stops operating, assistance during incidents, cooperation with authorities, and termination rights with minimum notice periods.

Extra terms for critical or important functions

Where a service supports a critical or important function, contracts need more: full service-level descriptions with quantitative and qualitative targets, notice and reporting duties, business continuity requirements and testing, participation in threat-led testing, and unrestricted rights of access, inspection and audit. Exit strategies with mandatory transition periods are expected.

Contract areaWhat the client will ask forWhat a prepared vendor provides
Service descriptionPrecise scope, functions supported, locationsA service schedule mapped to client functions and hosting regions
SubcontractingVisibility and conditions on subcontractorsA current subcontractor list and change notification process
Incident supportNotification time limits and investigation helpAn incident runbook naming contacts and time limits
Audit and accessAccess, inspection and audit rightsAn audit protocol and a pre-assembled evidence pack
ExitTransition period, data return, knowledge transferA documented, tested exit plan and export formats

Designing for exit

Exit is the obligation most often written but least often tested. Portability is an architectural property: data stored in documented schemas, infrastructure defined as code in the client’s accounts, open interfaces and observability that does not depend on one vendor. Our articles on how much cloud lock-in is acceptable and on transition plans for switching development vendors describe the practical steps. A useful test is to ask: if this supplier disappeared tomorrow, which repositories, credentials, runbooks and data exports would we need, and do we already hold them?

Resilience testing: from scans to threat-led tests

The regulation expects a testing programme proportionate to the entity’s size and risk. The recitals describe a range from vulnerability assessments and scans to scenario-based testing, and reserve advanced threat-led penetration testing (TLPT) for entities that are mature enough from an ICT perspective and identified by authorities. For TLPT, the threat intelligence provider must always be external, and internal testers may be used only under conditions including supervisory approval and rotation with external testers.

A layered programme

Test typeTypical frequency (set by your programme)Who runs itEvidence produced
Dependency and vulnerability scanningContinuous in CI and on running imagesEngineeringScan reports, remediation tickets
Penetration testing of critical journeysBefore major releases and periodicallyIndependent testersFindings and retest results
Restore and failover drillsScheduled per critical functionEngineering and operationsMeasured RTO and RPO
Scenario and tabletop exercisesAt least annually per critical functionEngineering, compliance, managementTimelines, decisions, lessons
Threat-led penetration testingAs required for identified entitiesExternal threat intelligence and testersTLPT reports and remediation plans

What vendors should expect

Contracts for critical functions can require vendors to participate in the client’s TLPT. That means agreeing scope, test windows and safe-guards in advance, ensuring that shared infrastructure does not expose other customers, and having a remediation process for findings.

A 90-day preparation plan and checklist

Whether you are an in-house team catching up or a vendor preparing for client questionnaires, a focused 90-day plan works better than a sprawling compliance programme. The phases below assume compliance has already confirmed which regime applies.

Days 1–30: see what you run

  1. Build or refresh the inventory of services, data stores and third-party dependencies, tagged by business function.
  2. Identify which functions are critical or important and which services and suppliers support them.
  3. Collect every ICT contract and check it against the register template your entity uses.

Days 31–60: close evidence gaps

  1. Add service-level indicators and affected-client estimates for each critical journey.
  2. Run one restore drill and one timed incident tabletop; record times.
  3. Draft contract addenda for missing terms: notification limits, audit rights, subcontracting, exit support.

Days 61–90: make it repeatable

  1. Automate inventory reconciliation and pipeline attestations.
  2. Schedule the twelve-month testing calendar.
  3. Write and walk through an exit plan for the most concentrated supplier.

Vendor DORA pack checklist

  • Service description mapped to client functions and processing locations
  • Current subcontractor list with locations and roles
  • Incident notification runbook with named contacts and time limits
  • Logging, monitoring and backup evidence for the services provided
  • Recent penetration test summary and remediation status
  • Business continuity and recovery test results
  • Exit plan: data export formats, transition period, documentation and handover
  • Audit protocol describing how clients and supervisors can exercise access rights

Costs and risks to plan for

The main costs are engineering time for observability and automation, independent testing, and legal effort on contracts. The main risks are inventories that drift from reality and exit clauses nobody has rehearsed. Budget for maintenance: registers, tests and contracts need updating as the product and supplier base change.

At PoliteTech, our financial services software work focuses on the controls compliance teams ask for, such as role-based permissions, audit logs, secure document storage and tested sensitive flows, while regulatory responsibility stays with the client’s organisation.

Frequently asked questions

Does DORA apply directly to our software development vendor?

Usually not directly. DORA is addressed to financial entities, which must impose its requirements on ICT providers through contracts and oversight. Only providers designated as critical by the ESAs are subject to direct EU oversight. In practice, a development partner supporting a critical function will still need to accept DORA-driven contract terms, audits and testing participation.

We are a small e-money institution. Do we need threat-led penetration testing?

Not necessarily. Advanced threat-led testing applies to entities identified by competent authorities, and some smaller entities follow a simplified ICT risk framework. You still need a proportionate testing programme, including vulnerability scanning and tests of critical systems. Confirm your status with your competent authority and compliance adviser.

How quickly must a major ICT incident be reported?

Under Delegated Regulation (EU) 2025/301, the initial notification is due within four hours of classifying the incident as major and no later than 24 hours from becoming aware of it. An intermediate report follows within 72 hours of the initial notification, and a final report no later than one month after the latest intermediate report.

What should be in a DORA-ready exit plan?

A list of the data, code, configuration and credentials you would need; agreed export formats; a transition period in the contract; a named owner; and evidence that you have walked through the plan. For critical functions, test at least the data export and a restore into an alternative environment.

Sources and methodology

Guidance reflects PoliteTech delivery experience. The external references below informed specific points in this article.

  1. EIOPA: Digital Operational Resilience Act (DORA) overview — accessed 9 November 2026. Application date of 17 January 2025, scope of the five areas and the list of Level 2 technical standards.
  2. EUR-Lex: Regulation (EU) 2022/2554 (DORA), full text — accessed 9 November 2026. Management body accountability, simplified framework, register of information, contract terms, exit strategies and TLPT conditions as described in the recitals.
  3. EUR-Lex: Commission Delegated Regulation (EU) 2025/301 on incident reporting content and time limits — accessed 9 November 2026. Time limits for initial notification, intermediate report and final report of major ICT-related incidents.
  4. EIOPA: ESAs designate critical ICT third-party providers under DORA (18 November 2025) — accessed 9 November 2026. First designation of critical ICT third-party providers and use of registers of information in the assessment.
  5. EBA: Digital Operational Resilience Act oversight page — accessed 9 November 2026. Role of the ESAs as Lead Overseers and their oversight powers over critical providers.

Could your platform evidence a major incident report within four hours?

We can review your fintech product’s logging, recovery and vendor documentation against the evidence DORA-regulated clients ask for, and plan the engineering work to close the gaps.