From AI Pilot to Production: Why Pilots Stall and How to Plan the Second Phase
A successful AI pilot proves that something can work. It does not prove that your organisation can run it every day. This guide explains why pilots stall and how to plan a second phase that gets a working idea into production.
TopicsAI Agents and AutomationBusiness Operations and Integration
Key takeaways
- Most pilots stall for organisational reasons (no owner, no budget line, unclear value) rather than because the model failed.
- Gartner expects at least 30% of generative AI projects to be abandoned after proof of concept by the end of 2025, citing data quality, risk controls, cost and unclear value.
- The second phase is a different project: it needs a product owner, production data pipelines, an evaluation set, monitoring, and a run budget, not just a better prompt.
- Decide on scale-up with a written go/no-go gate based on thresholds agreed before the pilot ends, signed off by the people who will own the system.
- Plan the second phase in three tracks run in parallel: product and process, engineering and data, and risk and operations.
On this page
- Why AI pilots stall after a good demo
- What is genuinely different about the second phase
- How to decide which pilots deserve a second phase
- Planning the second phase in three parallel tracks
- An illustrative second-phase plan
- Costs and risks to plan for in phase two
- Second-phase checklist
- Frequently asked questions
- Sources and methodology
The pattern is familiar. A team builds an AI pilot in six or eight weeks. The demo goes well, senior people are impressed, and a slide says the approach could save significant time. Six months later the pilot is still a pilot, used by a handful of enthusiasts, with no budget to harden it and no one quite sure who is responsible for it.
This article is for founders, CEOs, COOs and technology leaders who have one or more promising pilots and need to decide what happens next. It explains why pilots stall, what is genuinely different about the second phase, how to decide which pilots deserve it, and how to plan the work so the result is a system people rely on rather than a demo that slowly decays. If you are still choosing your first pilot, start with our guide on how to scope an AI pilot; this article picks up where that one ends.
Why AI pilots stall after a good demo
When we review stalled pilots with clients, the model is rarely the main problem. The causes are usually structural, and they are consistent with what larger studies report.
What the research points to
In July 2024 Gartner predicted that at least 30% of generative AI projects would be abandoned after proof of concept by the end of 2025, naming poor data quality, inadequate risk controls, escalating costs and unclear business value as the causes. McKinsey’s state of AI survey from May 2024 found that 65% of respondents said their organisations regularly use generative AI in at least one function, yet only 46 of 876 respondents attributed more than 10% of EBIT to it. Adoption is broad; production value is concentrated.
The five stall patterns we see most
- No production owner. The pilot was run by an innovation team or an enthusiastic manager. Nobody in the business unit has agreed to own the outcome, the budget or the risk.
- Pilot data is not production data. The pilot used a cleaned extract or a curated set of documents. Production means live, messy, permissioned data arriving continuously.
- No agreed definition of good. Success was judged by impressions in a demo. Without an evaluation set and thresholds, nobody can say whether a new version is better or worse.
- Run costs were never estimated. Model usage, hosting, monitoring and human review were invisible in the pilot, then appear as a surprise when usage grows.
- Risk review arrives late. Legal, security and compliance see the system for the first time when someone asks to roll it out, and reasonably ask for changes that were cheap to make earlier.
McKinsey’s survey notes that high performers are nearly twice as likely to involve legal and embed risk reviews early in development, and that 70% of high performers report data challenges such as governance and integration. Both findings match the stall patterns above: the work that makes production possible is mostly outside the model.
What is genuinely different about the second phase
The second phase is not the pilot with more users. It is a different project with different goals, and treating it as an extension is a common reason for disappointment.
| Dimension | Pilot | Second phase (production) |
|---|---|---|
| Goal | Prove the idea can work | Deliver reliable value every day |
| Users | A few volunteers | A whole team or customer segment, including sceptics |
| Data | Curated extract | Live pipelines with permissions, freshness and error handling |
| Quality judgement | Demo impressions | Evaluation set with agreed thresholds, run on every change |
| Integration | Standalone tool or copy-paste | Embedded in existing systems and workflows |
| Operations | Best effort | Monitoring, alerting, incident process, support rota |
| Cost visibility | Absorbed in a project budget | A run budget with per-unit cost tracking and limits |
| Governance | Informal | Documented risk assessment, approvals and review cycle |
The software around the model
Google’s architecture guidance on MLOps and continuous delivery for machine learning makes a point that applies equally to generative AI: only a small fraction of a production ML system is the model code itself. Data collection, validation, serving, monitoring and configuration make up most of it. The same guidance describes a manual, notebook-driven starting point where releases are infrequent and there is little monitoring, and warns that models in this state often fail after deployment because they do not adapt to changes in data. Most pilots sit at exactly that level.
For leaders, the practical implication is that the effort in phase two is often larger than the pilot, and most of it is conventional software, data and operations work. Budget and staff it accordingly.
How to decide which pilots deserve a second phase
Not every successful pilot should scale. Some solved a problem that turns out to be small; others depend on data that cannot be made available in production. A short, honest assessment protects your budget for the ones that matter.
A go/no-go gate
NIST’s Generative AI Profile (NIST AI 600-1, July 2024) suggests setting minimum performance or assurance thresholds and applying them in go/no-go deployment decisions, and sharing pre-deployment test results with whoever holds release authority. That is good practice for a scale-up decision too. Write the gate down before the pilot ends.
| Criterion | Question to answer | Evidence required |
|---|---|---|
| Value | Is the benefit large enough to justify production cost? | Measured time or cost saved in the pilot, extrapolated with stated assumptions |
| Quality | Does the system meet agreed thresholds on a representative test set? | Evaluation results, including failure cases |
| Data feasibility | Can production data be accessed legally, securely and reliably? | Data owner sign-off; pipeline design |
| Ownership | Who will own the outcome, budget and risk? | Named business owner who has agreed in writing |
| Risk | Are risks understood and controllable? | Risk assessment reviewed by legal, security and compliance |
| Run cost | What will it cost per month at expected volume? | Cost model with per-transaction estimate and limits |
Gartner’s recommendation is to compare total costs with business value and expand only where results meet or exceed expectations, while accepting that returns may take longer to appear. If a pilot fails two or more of the criteria above, the right decision is usually to stop or redesign, not to push on and hope.
Choosing between several pilots
If you have more pilots than capacity, score each criterion from one to five and weight value and ownership most heavily. A pilot with moderate value and a committed owner is usually a better bet than a dazzling one that no business unit wants to run.
Planning the second phase in three parallel tracks
We find it helpful to plan phase two as three tracks that run in parallel, each with a named lead. This stops the engineering work racing ahead of the process change, or risk review becoming a final hurdle.
Track 1: product and process
- Appoint a product owner from the business unit that benefits.
- Map the target workflow: where the AI output enters, who reviews it, what happens when it is wrong.
- Define adoption measures (active users, share of eligible cases processed) and value measures (time per case, error rate, turnaround).
- Plan training and communication for users who were not part of the pilot.
Track 2: engineering and data
- Replace pilot data extracts with production pipelines, including permissions and freshness checks.
- Build an evaluation set from real cases and run it automatically on every change to prompts, models or retrieval. Our guide to building a test set for knowledge search shows one way to do this.
- Integrate with the systems of record users already work in.
- Add logging, cost tracking per transaction, rate limits and fallbacks for model or provider outages.
Track 3: risk and operations
- Complete a risk assessment covering data privacy, information security, intellectual property and inaccurate outputs, which McKinsey’s survey found to be the most commonly experienced generative AI risk.
- Agree an incident process: NIST AI 600-1 suggests defining minimum criteria for incident reports and conducting after-action reviews.
- Set up monitoring for quality drift and cost, with alerts that reach a named person.
- Agree the support model: who answers user questions, who fixes defects, and in what time.
For a more detailed technical checklist, see our readiness checklist for LLM features.
An illustrative second-phase plan
The following example is illustrative, not a client case. It shows how the tracks fit together in time.
For example, a 150-person insurance broker might have piloted an assistant that drafts summaries of incoming claim documents for handlers. In the pilot, eight handlers used it on a curated set of past claims and reported that drafting took noticeably less time. The second phase might be planned over roughly twelve weeks:
- Weeks 1 to 2: confirm the claims operations manager as product owner; agree thresholds for summary accuracy on a 200-case evaluation set; draft the risk assessment.
- Weeks 2 to 6: build a pipeline from the document management system with access controls; integrate draft summaries into the claims system as an editable field rather than a separate tool; add per-document cost logging.
- Weeks 4 to 8: legal and compliance review of data handling and customer communications; agree that handlers must confirm each summary before it is used.
- Weeks 8 to 10: limited release to one team of 25 handlers, with daily review of flagged errors and weekly evaluation runs.
- Weeks 10 to 12: go/no-go review against thresholds, adoption and run cost; then staged release to remaining teams.
The numbers in this example are assumptions for illustration. The structure is the point: the model work is a minority of the plan, and the gates are set in advance.
We have seen the same shape in our own delivery. In the Clinical Operations Platform Suite we built for an Australian healthcare client, AI referral processing and dictation-to-report features had to sit inside existing clinical workflows with human review, rather than being offered as separate tools.
Costs and risks to plan for in phase two
Gartner notes that generative AI costs are less predictable than those of many other technologies. The way to reduce that uncertainty is to make each cost line visible and owned.
| Cost or risk | What drives it | How to control it |
|---|---|---|
| Model usage | Volume, prompt and context length, model choice | Per-transaction cost tracking, caching, using smaller models where quality allows, hard monthly limits |
| Data engineering | Number and quality of sources, permissions, freshness | Start with the minimum sources needed; fix data quality at source where possible |
| Human review | Share of outputs that need checking | Risk-based review: full review for high-impact cases, sampling for low-impact ones |
| Evaluation and monitoring | Test set maintenance, drift detection | Budget ongoing time, not a one-off task |
| Inaccurate outputs | Model confabulation, poor retrieval | Evaluation thresholds, citations, human confirmation for consequential actions |
| Provider dependency | Changes to models, pricing or terms | Abstraction layer, evaluation set to test alternatives, contract review |
Funding model
Pilots are usually funded from an innovation or project budget. Production systems need a recurring line in the owning department’s budget. Agree this before the build starts. If no department is willing to carry the run cost, that is strong evidence the value case is weaker than the demo suggested.
Second-phase checklist
Use this before committing budget to scaling a pilot.
- A named business owner has agreed in writing to own outcome, budget and risk.
- Go/no-go thresholds for quality, adoption and cost are written down.
- An evaluation set built from real cases exists and runs automatically.
- Production data access is approved by the data owner, with permissions enforced.
- The target workflow is mapped, including what happens when the AI is wrong.
- Integration with existing systems of record is in scope.
- A cost model exists with per-transaction estimates and monthly limits.
- Legal, security and compliance have reviewed the design, not just the finished system.
- Monitoring, alerting and an incident process are defined, with named people.
- A recurring run budget is agreed in the owning department.
- A review date is set to revisit value, cost and risk after release.
If you have several pilots and limited capacity, our AI Transformation Planning engagement scores and sequences opportunities by value, effort and risk, then delivers the first one or two initiatives, so that the roadmap is tested against real delivery rather than slides.
Frequently asked questions
How long should the second phase take?
It depends on integration and data work rather than the model. McKinsey’s 2024 survey found most organisations take one to four months from project start to production, with highly customised models more likely to take five months or more. Plan in stages with gates rather than one long build.
Should the same team that ran the pilot build the production version?
Usually some of them should, for continuity, but the team needs to add production skills: data engineering, integration, testing and operations. Most importantly, a business owner must join, because the pilot team rarely owns the workflow being changed.
What if the pilot worked but nobody wants to fund production?
Treat that as a signal about value, not just a budgeting problem. Revisit the value case with the department that would benefit. If no one will carry the run cost, it is often better to stop and redirect effort.
Can we keep using the pilot code?
Sometimes, but expect substantial rework. Pilot code often uses data extracts, lacks permissions, logging and tests, and has no evaluation harness. Review it as you would any inherited codebase before deciding.
How do we stop costs escalating once usage grows?
Track cost per transaction from day one, set hard monthly limits with alerts, use smaller or cached models where your evaluation set shows quality holds, and review the cost model at each release gate.
Sources and methodology
Guidance reflects PoliteTech delivery experience. The external references below informed specific points in this article.
- Gartner: Gartner Predicts 30% of Generative AI Projects Will Be Abandoned After Proof of Concept By End of 2025 (July 2024) — accessed 9 November 2026. Supports the abandonment prediction, the four stated causes, the unpredictability of costs and the recommendation to compare costs with value before expanding.
- McKinsey: The state of AI in early 2024 (May 2024) — accessed 9 November 2026. Supports adoption figures, the concentration of EBIT impact, inaccuracy as the most experienced risk, high performers involving legal early, data challenges and time to production.
- Google Cloud: MLOps: Continuous delivery and automation pipelines in machine learning — accessed 9 November 2026. Supports the point that model code is a small part of a production system and the challenges of manual, unmonitored deployments.
- NIST AI 600-1: Generative Artificial Intelligence Profile (July 2024) — accessed 9 November 2026. Supports go/no-go thresholds, sharing test results with release authorities, incident reporting criteria and after-action reviews.