Home / Insights / Architecture and Modernization
Architecture and Modernization
Patching at Machine Speed: What Your Software Maintenance Agreement Must Promise in 2027
Microsoft fixed nearly 1,100 vulnerabilities in a single month this November, the average organisation still takes 43 days to patch, and EU reporting clocks now run in hours. If your maintenance agreement still says “security updates applied monthly”, this guide shows what to replace it with.
Key takeaways
- Security-fix volume has jumped by an order of magnitude in 2026 as AI tools find flaws faster; a maintenance agreement priced and scheduled around a quiet monthly patch window no longer matches the workload.
- Speed targets should follow exploitation evidence and exposure, not severity scores alone. A four-tier patch SLA (24 hours to mitigate, 72 hours to patch for actively exploited flaws you actually expose) is a workable starting point.
- The real constraint on patch speed is regression testing. If the automated suite cannot give a release decision in under an hour, no SLA number in the contract is achievable.
- Since 11 September 2026 the EU Cyber Resilience Act requires manufacturers to give an early warning of an actively exploited vulnerability within 24 hours. Your maintenance partner’s notification duty to you has to be shorter than your own legal clock.
- Ask for evidence every month: a current component inventory, patch latency by tier, the open-exposure list and the exceptions you approved. A promise without a report is not a service level.
On this page
- What changed in 2026: the numbers
- Why the usual maintenance clause fails
- A tiered patch SLA you can put in a contract
- Testing is the constraint: the QA side of fast patching
- EU reporting clocks and who watches them
- Capacity, pricing and what to measure
- Twelve questions to ask your maintenance partner
- Frequently asked questions
- Sources and methodology
On Tuesday 10 November 2026 Microsoft released fixes for 1,093 security vulnerabilities in one monthly update. A year earlier the company was averaging about 100 a month. I run project delivery and QA, not a security operations centre, but that number landed on my desk anyway, because every one of those fixes is a change that somebody has to assess, test and release without breaking the product. That somebody is usually the maintenance team.
This article is for the people who sign or manage a software maintenance agreement: CTOs, product owners, operations directors and procurement leads. It is not a security architecture guide. It answers a narrower question: given what happened to patch volume and exploitation speed in 2026, what should the security-update part of a maintenance agreement promise for 2027, how do you make that promise testable, and what will it cost in process and capacity?
What changed in 2026: the numbers
Three things moved at once: how many fixes arrive, how quickly flaws are attacked, and how slowly most organisations respond.
Fix volume rose by an order of magnitude
Brian Krebs reported on 10 November 2026 that Microsoft’s November update fixed 1,093 vulnerabilities, 63 of them rated critical, with one already being exploited (a spoofing flaw in Outlook). Microsoft had shipped more than 1,400 fixes the month before and more than 5,100 so far in 2026, and it credits advances in AI for helping to find and fix that volume. The same week brought nearly 100 fixes in Firefox 160 and at least 110 from Adobe. Counting methods differ: Qualys counts 1,252 CVEs for the same Microsoft release, against 63 in November 2025.
The climb was steep. A Cloud Security Alliance research note from October 2026 collected press-reported monthly counts of 137 in May, 206 in June, 622 in July, 419 in August and 1,411 in October, and noted that Microsoft has not said how many of those fixes came from AI-assisted discovery. For planning purposes the cause matters less than the direction: the tools that find flaws are improving for vendors and attackers alike, and nothing suggests the volume will fall back in 2027.
Exploitation often comes before the patch
Google’s Mandiant team reported in M-Trends 2026 that exploits were the most common way attackers got in for the sixth year running, at 32% of the intrusions it investigated, and that the mean time to exploit had fallen to an estimated minus seven days. In plain terms, exploitation now routinely starts before a fix exists. Verizon’s 2026 Data Breach Investigations Report reaches the same conclusion from a different dataset: 31% of breaches now begin with a software vulnerability, ahead of stolen passwords.
Most organisations are getting slower, not faster
The same Verizon report puts the median time to fully patch at 43 days, up from 32 the year before, and finds that only 26% of the vulnerabilities on CISA’s Known Exploited Vulnerabilities list were fully remediated, down from 38% (figures as reported by Help Net Security). More fixes, faster attacks and slower patching is the gap your maintenance agreement has to close.
Most fixes still do not matter to you
There is one reassuring number. Ivanti’s Chris Goettl told Krebs that about 95,000 vulnerabilities have been assigned CVE identifiers this year, yet only 217 have been added to CISA’s exploited list. The job is not to apply everything immediately. The job is to find, within hours, the handful that are both being exploited and reachable in your system, and to move those at a speed the old monthly cycle never required.
Action: ask your maintenance partner how many security-relevant updates touched your product’s components in each of the last six months, and how long each took to reach production. If nobody can produce that table, start there.
Why the usual maintenance clause fails
Most maintenance agreements I review were written for a calmer world. The security part is typically one sentence inside a list of services, and it fails in predictable ways.
| Typical wording | Why it fails in 2027 | What to write instead |
|---|---|---|
| “Security patches applied monthly” | A fixed cadence ignores exploitation. An actively exploited flaw waits up to a month; trivial ones consume the same slot. | Deadlines by tier, driven by exploitation evidence and exposure. |
| “Critical vulnerabilities fixed within 5 business days” | “Critical” by whose score? November’s exploited Outlook flaw was rated only moderate, as Qualys notes. | A named triage rule that includes exploited-in-the-wild status and whether you expose the component. |
| “Provider will keep dependencies up to date” | No inventory means nobody can say which dependencies exist, so the promise cannot be checked. | A component inventory (SBOM) as a monthly deliverable. |
| “Best efforts” or “commercially reasonable efforts” | Not measurable, so not enforceable and not reportable to your board or auditor. | Measured latency per tier, reported monthly, with exceptions you sign off. |
| Nothing about notification | You learn about an exploited component from the news, after your own legal clock has started. | A notification duty in hours, with named contacts on both sides. |
The pattern is the same in each row: the clause describes an activity, when what you need is an outcome with a deadline and evidence. Our earlier guide to support SLAs and severity levels covers incident response; patching needs its own table because the trigger is different. An incident is something that has happened to you. A vulnerability is something that has not happened yet, and that is exactly why it gets deferred.
A tiered patch SLA you can put in a contract
The table below is the starting point we recommend for a business web or mobile product with a normal risk profile. It is our recommendation, not an industry standard, and the numbers should be tightened for regulated or internet-critical systems. What matters is the structure: the clock is set by evidence of exploitation and by exposure, and every tier has both a mitigation deadline and a patch deadline.
| Tier | Trigger | Triage decision | Mitigation in place | Fix in production |
|---|---|---|---|---|
| 0 | Exploited in the wild (on the CISA list or confirmed by the vendor) and the affected component is reachable in your deployment | 4 working hours | 24 hours | 72 hours |
| 1 | Critical or high severity in an internet-facing, authentication, payment or personal-data path; no known exploitation | 1 working day | 3 working days | 7 calendar days |
| 2 | High severity, internal-only or needs an authenticated user; or a Tier 0 flaw in a component you ship but do not expose | 2 working days | Not required | 30 calendar days |
| 3 | Everything else, including routine framework and library updates | Weekly review | Not required | Next scheduled maintenance release, 90 days at most |
Four definitions that make the table enforceable
- When the clock starts. At public disclosure or vendor advisory, not when a ticket is raised. Otherwise the fastest way to meet the SLA is to notice late.
- What “reachable” means. The vulnerable code is loaded and can be reached by an input an attacker controls. This is a judgement, so the agreement should say who makes it and that the reasoning is written down.
- What counts as mitigation. A configuration change, a firewall or WAF rule, disabling a feature or isolating a service. Mitigation buys time for testing; it is retired when the fix ships.
- Who can approve an exception. A named person on your side, in writing, with an expiry date. Exceptions without expiry dates become the backlog.
Qualys describes a similar idea for infrastructure teams in its November guidance: deploy in waves, starting with proven risky exposures, and treat patches with low reliability ratings as “test first” rather than “skip”. It reported that about 35% of November’s patches carried a low reliability rating on the day after release. That is the argument for having both a mitigation column and a fix column: a patch you cannot yet trust should not leave you exposed while you test it.
The prerequisite: you cannot triage what you cannot list
A four-hour triage decision is only possible if someone can answer “do we use this, which version, and where?” in minutes. That requires a current component inventory for every deployed service and app, generated by the build and not maintained by hand. Our guide to SBOMs and dependency policy explains how to produce one, and the end-of-life register covers the related problem of components that will never receive a fix at all. In the agreement, make the inventory a named monthly deliverable.
Action: take your last three security updates and place each in a tier after the fact. If you cannot agree which tier they belonged to, the triage rule needs more work before it goes into a contract.
Testing is the constraint: the QA side of fast patching
This is the part I care most about, and the part contracts usually leave out. Nobody misses a patch deadline because typing the version number took too long. They miss it because the only way to know whether the update broke something is two days of manual regression, and the testers are busy with the release that was already planned.
A 72-hour production deadline leaves, realistically, a few hours for verification. So the patch SLA is really a test-automation requirement in disguise.
What a fast patch lane needs
- A smoke suite that finishes in under 15 minutes. Login, the two or three revenue-critical journeys, and one write to each core data store. It runs on every dependency change without anyone asking.
- A regression suite that gives a release decision in under an hour. Not exhaustive, but covering the journeys you would be embarrassed to break. If it takes four hours or fails randomly, people will skip it under pressure.
- Contract tests on integrations. Dependency updates most often break the edges: payment providers, identity, messaging. Tests against recorded contracts catch these without needing the third party’s sandbox to be available.
- A staging environment that matches production versions. Proving a patch on an environment with different library versions proves nothing.
- A rollback that has been rehearsed. Canary or blue-green releases let you ship a patch to a small share of traffic and reverse it in minutes; see our comparison of release strategies.
- A separate lane for mobile. App store review sits inside your deadline. For Tier 0 the fix is often server-side mitigation first, then an expedited app release, with a minimum-version check if the flaw is in the client.
A patch-only release path
Fast lanes fail when a security fix is bundled with feature work, because the feature is never quite ready. Agree a patch-only path: a branch from the current production version, the dependency change alone, the automated suites, a short manual check of anything the suites do not cover, and release. The feature train carries on separately and picks the fix up at its next merge. Automated dependency scanning in the pipeline, covered in our guide to security testing in CI, is what opens the pull request in the first place.
Where AI helps, and where a person still signs
AI coding agents are now good at the mechanical part: reading an advisory, finding the affected versions in a repository, proposing the upgrade and fixing the compile errors it causes. The Cloud Security Alliance note recommends exactly this kind of defensive use, such as patch impact summaries, with human approval before production. I agree with the boundary. Let the agent prepare the change and the evidence; keep a named engineer on the reachability judgement and a named QA owner on the release decision. Those two signatures are what you will be asked for after an incident.
Action: time your regression suite today. If the answer is longer than an hour, or “it depends who runs it”, budget for test automation before you sign a faster SLA.
EU reporting clocks and who watches them
If you sell a software product, or a device with software in it, into the European Union, 2026 added a legal deadline on top of the technical one. The Cyber Resilience Act entered into force on 10 December 2024. Its main obligations apply from 11 December 2027, but the reporting obligations started on 11 September 2026.
According to the European Commission’s reporting page, a manufacturer must notify an actively exploited vulnerability, or a severe incident affecting the security of its product, through ENISA’s Single Reporting Platform on this timetable:
| Step | Deadline | What your maintenance team must be able to supply |
|---|---|---|
| Early warning | Within 24 hours of becoming aware | Which product and versions are affected, and whether exploitation is confirmed |
| Notification | Within 72 hours of becoming aware | Nature of the vulnerability, mitigation taken, what users should do |
| Final report (exploited vulnerability) | No later than 14 days after a corrective measure is available | Root cause, the fix, and how it was delivered to users |
| Final report (severe incident) | Within one month of the 72-hour notification | Full incident account and remediation |
Two details from ENISA’s platform FAQ matter for planning. First, reporting applies to all in-scope products, including those placed on the market before 11 December 2027, so an older product still on sale is covered. Second, a manufacturer without a main establishment in the EU still has a designated reporting route, so being based outside the EU does not remove the duty.
Whether your software is in scope is a legal question. The Act covers products with digital elements placed on the EU market; software built for one organisation’s internal use, and services that are not part of a product, raise scope questions that the Commission’s guidance addresses and that you should put to counsel. This article is not legal advice.
What this changes in the maintenance agreement
- The legal duty stays with you. The manufacturer reports, not the contractor. But the contractor is usually the first to see the evidence.
- Their clock must be shorter than yours. If you have 24 hours, your partner’s duty to tell you about suspected exploitation in your product should be measured in single-digit hours, around the clock, to a named contact with a deputy.
- Agree the evidence pack in advance. Affected versions, logs, the mitigation applied. Nobody writes this well for the first time at 2 a.m.; our guide to incident runbooks has a format.
- Rehearse once. A one-hour tabletop exercise with your partner, using a real past advisory, will show whether the 24-hour early warning is achievable.
Capacity, pricing and what to measure
A tighter SLA is not free, and a partner who accepts one without changing anything else has not thought about it. Three things need to be settled.
Reserve capacity instead of hoping for it
Security work arrives unevenly: nothing for three weeks, then two Tier 0 items in the same week as a feature deadline. A retainer that is fully allocated to planned work has no room for it. Reserve a visible share of monthly maintenance hours for security updates, let unused hours roll into Tier 3 clean-up, and agree in advance what happens when a bad month exceeds the reserve. The right share depends on how many components you run and how exposed they are, so set it from your own six-month history, not from a rule of thumb. Our analysis of maintenance cost as a percentage of build cost gives the wider budget context.
Out-of-hours cover is a separate line
A 24-hour mitigation deadline that falls on a Saturday needs someone on call. Price that explicitly, name the people, and plan it around public holidays on both sides. If your product does not justify weekend cover, say so in the agreement and accept the longer deadline knowingly.
The monthly report
| Metric | What it tells you |
|---|---|
| Security updates received, by tier | Workload and trend; the basis for next quarter’s reserve |
| Median and worst-case time to production, by tier | Whether the SLA is being met, and the outlier that needs explaining |
| Open exposures past deadline, with owner and reason | The real risk list |
| Exceptions approved, with expiry dates | Decisions you made, so they do not become defaults |
| Regression suite duration and pass rate | Whether the fast lane is still fast |
| Components at or near end of support | Next year’s forced upgrades |
The Cloud Security Alliance note makes the same point for internal teams: measure and publish remediation throughput, and ask suppliers about their patch cadence. A one-page report with these six lines, reviewed monthly, is what turns the clause into a managed service.
Twelve questions to ask your maintenance partner
Use these at renewal, or when comparing proposals. The useful answers are specific and come with an artefact you can look at. More planning material is on our planning checklists page.
- Can you show me the current component inventory for our production system, and how it was generated?
- How do you learn that a component we use has a new vulnerability, and how long does that take?
- Who decides whether a flaw is reachable in our deployment, and where is that decision recorded?
- What are your deadlines for an exploited, exposed flaw: triage, mitigation and production fix?
- When does the clock start: at disclosure or when you raise a ticket?
- How long does our regression suite take, and what does it not cover?
- Can a security fix be released on its own, without the features currently in progress?
- How is a patch rolled back, and when did you last rehearse it?
- What is the process for our mobile apps when a fix needs store review?
- Who is on call out of hours and on public holidays, and what does that cost?
- If you suspect our product is being exploited, who do you tell, how fast, and what evidence do we receive?
- What will the monthly security report contain, and may I see one from another engagement with the client details removed?
How a team works day to day matters as much as the clause; our engineering practices page describes the delivery habits we consider baseline. If you want a second opinion on an existing agreement, the tier table and the twelve questions above are the two things to bring to the conversation.
Frequently asked questions
How fast should security patches be applied in 2027?
It depends on evidence and exposure, not on a single number. For a flaw that is being exploited and is reachable in your system, we recommend mitigation within 24 hours and a production fix within 72 hours. For serious flaws on internet-facing paths with no known exploitation, seven days. Routine updates can wait for the next scheduled maintenance release, with a 90-day ceiling.
Is monthly patching still acceptable?
As the cadence for routine, low-risk updates, yes. As the only cadence, no. Mandiant’s M-Trends 2026 estimates that exploitation now begins on average before a patch is released, so anything actively exploited needs a separate, faster lane with its own deadlines.
Do we have to apply every security update?
No. Of roughly 95,000 vulnerabilities assigned CVE identifiers in 2026, only 217 had been added to CISA’s exploited list, according to figures quoted by Krebs on Security. The skill is triage: identifying quickly which updates affect components you run and expose, and recording why the others can wait.
Does the EU Cyber Resilience Act apply to custom software?
The Act covers products with digital elements placed on the EU market. If you sell software or a connected device to customers in the EU, assume it is relevant and check scope with a lawyer. Software developed solely for one organisation’s own internal use is a different case. Either way, the reporting timetable (24 hours, 72 hours, 14 days) is a sensible benchmark for how quickly your maintenance partner should be able to produce facts.
Will a faster patch SLA increase our maintenance cost?
Usually, in three places: reserved hours for unplanned security work, out-of-hours cover if you choose it, and a one-off investment in test automation if your regression suite is slow. The automation pays back on every feature release as well, so treat it as delivery infrastructure, not a security surcharge.
Can AI agents apply patches automatically?
They can prepare them well: finding affected versions, proposing the upgrade and fixing the resulting build errors. We recommend keeping a human on two decisions, whether the flaw is reachable in your deployment and whether the patched build is safe to release, because those are the judgements you will need to evidence afterwards.
Sources and methodology
Figures were checked against the sources below on the access date shown. Patch counts differ between sources because of counting methods, and we state which count we use. The tier table, test targets and checklists are PoliteTech recommendations based on delivery experience, not industry standards. Nothing here is legal advice.
- Krebs on Security: Microsoft Fixes Nearly 1,100 Security Vulnerabilities (10 November 2026) — accessed 14 November 2026. Microsoft November 2026 figures (1,093 fixes, 63 critical, one exploited), the 2026 running total, the earlier monthly average, other vendors’ releases, and the CVE and exploited-list counts attributed to Ivanti.
- Qualys: November Patch Tuesday: How to Sort Through the Patches (13 November 2026) — accessed 14 November 2026. The alternative count of 1,252 CVEs against 63 in November 2025, the moderate rating of the exploited Outlook flaw, the share of patches with a low reliability rating, and the wave-based deployment approach.
- Cloud Security Alliance: Patch Volume Saturation: Record Patch Tuesday and AI Discovery (15 October 2026) — accessed 14 November 2026. Press-reported monthly Microsoft patch counts from May to October 2026, the note that AI-attributed shares are unpublished, and recommendations on prioritisation, measurement and supplier questions.
- Google Cloud / Mandiant: M-Trends 2026 (23 March 2026) — accessed 14 November 2026. Exploits as the leading initial infection vector (32% of intrusions) and the estimated mean time to exploit of minus seven days.
- Verizon: 2026 Data Breach Investigations Report — accessed 14 November 2026. The 31% share of breaches beginning with exploitation of a software vulnerability.
- Help Net Security: Verizon DBIR: Vulnerability exploitation is the dominant initial access vector (20 May 2026) — accessed 14 November 2026. Verizon’s median time to fully patch (43 days, up from 32) and the share of known exploited vulnerabilities fully remediated (26%, down from 38%).
- European Commission: Cyber Resilience Act — accessed 14 November 2026. Entry into force (10 December 2024), application of reporting obligations (11 September 2026) and of main obligations (11 December 2027), and the scope of products with digital elements.
- European Commission: Cyber Resilience Act, Reporting obligations — accessed 14 November 2026. The 24-hour, 72-hour, 14-day and one-month reporting deadlines and the role of the Single Reporting Platform.
- ENISA: Single Reporting Platform, Frequently Asked Questions — accessed 14 November 2026. Coverage of products placed on the market before 11 December 2027 and the reporting route for manufacturers without a main EU establishment.
- CISA: Known Exploited Vulnerabilities Catalog — accessed 14 November 2026. The public list used as the exploitation trigger in the tier table.
Related reading
Continue your research
Want a second opinion on your maintenance agreement?
Send us the security-update clause and a description of your stack. We will tell you where the deadlines, testing and reporting need tightening.
