Software Maintenance Cost as a Percentage of Build Cost: What the Data Says and How to Budget Year Two

Most year-two software budgets start from a percentage of the build cost. This guide looks at what the evidence behind those percentages actually supports, why the ratio is a weak anchor, and how to replace it with a bottom-up estimate your finance team can test.

TopicsSoftware Costs and BudgetsBusiness Operations and Integration

Key takeaways

  • The popular “15 to 20% of build cost per year” rule has no single authoritative source; the best-documented public figure is portfolio-level, such as the US GAO’s finding that about 80% of federal IT spending goes on operating and maintaining existing systems.
  • A percentage of build cost is a weak anchor because the main drivers of year-two cost (platform churn, dependencies, usage growth, integrations and feature demand) are unrelated to what the build happened to cost.
  • Split year two into keep-the-lights-on work and planned improvement; budget the first as a floor you cannot skip and the second as a decision.
  • On illustrative assumptions, keep-the-lights-on effort is a higher share of build cost for small systems than for large ones, because platform and store requirements arrive regardless of size.
  • Budget run costs (hosting, third-party APIs, store fees, monitoring) separately from engineering effort, and review both quarterly against actuals.

When a finance lead asks what a new system will cost after launch, the answer is usually a percentage: “plan for 15 to 20% of the build cost every year.” It is quick, it sounds prudent, and it is almost never checked. The problem is not that the figure is always wrong. It is that nobody can say why it is right for this system, so it cannot be defended when the budget is squeezed or challenged when it is too generous.

This article is for founders, CFOs, product owners and operations leads preparing a budget for the year after launch. It looks at where the percentage rules come from and what public evidence supports, explains what actually drives year-two spend, gives a transparent tiered estimate built from stated assumptions, and sets out a step-by-step method and checklist for building your own. All figures in the worked examples are estimates from illustrative assumptions; we do not quote PoliteTech prices here. If you want the work itself done, our software maintenance and support service starts with a technical health check of exactly the drivers described below.

Where the percentage rule comes from, and what the evidence supports

Ask ten people for the annual maintenance ratio and you will hear 15%, 20%, 25%, or the claim that maintenance is 60 to 90% of total lifetime cost. These figures circulate in textbooks, vendor white papers and conference talks, often citing each other, and they rarely point to a dataset a buyer could inspect. Two things can be said with more confidence.

Portfolio-level data shows maintenance dominates

The most cited public figure comes from the US Government Accountability Office. In its report GAO-19-471 (June 2019), the GAO noted that the federal government planned to spend over USD 90 billion on IT that year and that about 80% of it went on operating and maintaining existing investments, including legacy systems. That is a large, audited number. It is also a portfolio number: it covers decades-old systems, operations staff and infrastructure, and it says nothing about what one new application will cost in its second year.

“Maintenance” means several different kinds of work

The international standard for the subject, ISO/IEC/IEEE 14764:2022, defines types of maintenance and treats it as a full lifecycle process, separate from operations such as backup and system administration. In practice the work divides into four familiar categories:

  • Corrective: fixing defects found in production.
  • Adaptive: keeping the software working as its environment changes, such as new operating systems, runtime versions, browser changes and app store rules.
  • Preventive: reducing future risk, such as dependency updates, security patches, refactoring and test coverage.
  • Perfective: improving the product, such as small features, usability changes, performance work and reporting.

Much of the confusion about percentages comes from mixing these. A figure of 60 to 90% of lifetime cost almost certainly includes years of perfective work, which is product development under another name. A figure of 15% probably excludes it. Both can be true for different definitions, and neither tells you what your system needs.

Action: before you accept any percentage, ask which of the four categories it includes. If the answer is unclear, treat the figure as a conversation starter, not a budget.

What actually drives year-two cost

The cost of maintaining a system depends on how much its environment changes and how much the business asks of it, not on what it cost to build. A system that was expensive because of complex one-off data migration may be cheap to maintain; a cheap mobile app with five third-party SDKs may be expensive. These are the drivers we look at first.

DriverWhy it creates workHow to estimate it
Runtime and framework lifecyclesRuntimes and frameworks reach end of life on published schedules. Node.js, for example, states that LTS releases typically receive critical fixes for 30 months in total, and odd-numbered releases reach end of life six months after release.List every runtime and major framework with its end-of-life date; count the upgrades that fall in the next 12 months.
App store and platform rulesMobile stores impose deadlines regardless of your roadmap. Google Play’s published requirement is that from 31 August 2026 new apps and updates target Android 16 (API level 36); apps that fall behind become unavailable to new users on newer devices.Add one adaptive release per platform per year as a floor, plus SDK updates.
Dependencies and securityEvery library brings updates and advisories; a typical web or mobile project has hundreds of transitive dependencies.Count direct dependencies; budget a regular update cycle, not only emergency patches.
IntegrationsEach third-party API can change versions, authentication or limits on its own schedule.Count external integrations; assume at least one material change per integration every one to two years.
Usage growthMore users and data expose performance limits and raise hosting and support load.Use the growth forecast in the business plan; flag thresholds where architecture changes.
Feature demandUsers and stakeholders ask for changes once the product is live.Treat as a separate, decided budget rather than part of maintenance.
Code health and knowledgeThin test coverage, missing documentation and staff turnover make every change slower.Use a code review or health check to set a multiplier on the estimates above.

None of these appears in the build invoice. That is why the ratio drifts so widely between systems, and why two applications with identical build costs can have year-two budgets that differ by a factor of three.

Action: fill in the third column for your own system. It usually takes a technical lead half a day and produces a far better estimate than any percentage.

A transparent year-two estimate by tier

The table below is illustrative. It estimates annual effort in person-weeks for three tiers of system, split by maintenance category, and multiplies by blended rates that we state explicitly. Every figure is an estimate built from these assumptions; substitute your own.

Assumptions

  • Blended rates: USD 35 to 55 per hour for a Vietnam-based team; USD 120 to 200 per hour for a US agency. These are planning assumptions, not quotes.
  • One person-week = 40 hours.
  • Basic: an internal web tool or simple customer portal with one or two integrations and modest usage.
  • Standard: a customer-facing web application plus iOS and Android apps, four to six integrations, steady growth.
  • Advanced: a multi-tenant SaaS or regulated platform with AI features, many integrations, on-call support and audit requirements.
Category (person-weeks per year)BasicStandardAdvanced
Corrective (bug fixing)3612
Adaptive (platform, runtime, store, integration changes)3814
Preventive (dependencies, security, refactoring, tests)2510
Support and monitoring2512
Keep-the-lights-on subtotal102448
Perfective (small improvements)41640
Total144088
Annual cost, Vietnam-based team (USD 35 to 55/h)USD 19,600 to 30,800USD 56,000 to 88,000USD 123,200 to 193,600
Annual cost, US agency (USD 120 to 200/h)USD 67,200 to 112,000USD 192,000 to 320,000USD 422,400 to 704,000

What the percentage looks like on these assumptions

Suppose, illustratively, that the basic system took 20 to 30 person-weeks to build, the standard system 60 to 90, and the advanced system 150 to 250. Keep-the-lights-on effort as a share of build effort then comes out at roughly 33 to 50% for the basic system, 27 to 40% for the standard one and 19 to 32% for the advanced one. Including perfective work raises all three considerably.

Two lessons follow. First, small systems carry a proportionally higher maintenance burden, because platform upgrades, store deadlines and security patches arrive whatever the size of the codebase. A rule of thumb calibrated on large systems will underfund small ones. Second, the perfective line is where most of the variation sits, and it is a business decision, not an engineering constant.

Action: rebuild the table for your own system with your vendor’s rates and your own tier description, and present keep-the-lights-on and perfective as two separate lines.

Run costs that sit outside engineering effort

A year-two budget also has to carry the costs of running the system, which are billed by suppliers rather than engineers and often appear under a different cost centre. They are easy to forget until the first renewal notice.

Run costWhat drives itIllustrative annual range (assumption)
Cloud hosting and databasesUsers, data volume, environments, redundancyUSD 1,000 to 5,000 basic; 5,000 to 30,000 standard; 30,000 and up advanced
Third-party APIs (maps, messaging, payments, AI models)Usage volume and pricing tiersHighly variable; model from expected transactions
Monitoring, logging and error trackingData ingested, seatsUSD 500 to 10,000 depending on volume
App store membershipsFixed feesApple Developer Program at USD 99 per year, as listed on Apple’s programme page; Google Play has its own registration fee
Licences and SaaS toolsSeats and editionsPer-seat; list them individually
Certificates, domains, email deliveryFixed and usage feesSmall, but list them so renewals are owned
Security testing and compliance evidenceCustomer and regulatory requirementsOne penetration test a year is common for customer-facing systems

The ranges are planning assumptions rather than benchmarks; the only reliable figures are the invoices from your first months in production. Usage-priced services, particularly AI model APIs, deserve a separate forecast tied to expected volume, because they scale with success in a way engineering effort does not.

Action: export the last three months of supplier invoices, annualise them, add the growth forecast, and keep this as a separate run-cost budget from engineering.

How to build the year-two budget step by step

The method below replaces the percentage with an estimate you can explain. It takes a few days of a technical lead’s and a finance lead’s time, and it gets faster every year because the actuals become the next year’s baseline.

  1. Inventory the system. List runtimes, frameworks, mobile platforms, direct dependencies, integrations, environments and supplier accounts, with owners.
  2. Date the forced changes. For each runtime, framework and store, note end-of-life dates and announced requirements falling in the next 18 months. These are fixed adaptive tasks.
  3. Measure the defect baseline. Use the first months of production to estimate defects per month and average fix effort. Without data, use the corrective line in the table above as a starting point.
  4. Assess code health. A short review of test coverage, documentation and architecture gives a multiplier: well-tested, documented code may need less than the table; fragile code more.
  5. Estimate keep-the-lights-on effort by category, in person-weeks, and convert at your vendor’s or team’s actual rate.
  6. Decide the perfective budget separately. Agree with the business how much improvement capacity it wants, as a number of person-weeks or a share of team time.
  7. Add run costs from annualised invoices plus growth.
  8. Add a contingency of 10 to 15% for unplanned incidents and supplier changes.
  9. Choose the engagement model that matches the shape of the work: a monthly retainer for steady keep-the-lights-on effort, project budgets for upgrades and features.
  10. Review quarterly against actuals and move unused perfective capacity rather than letting keep-the-lights-on work be starved.

Our earlier article on what businesses should budget after launch covers the categories of post-launch cost in more general terms, and software retainer models explains how hours banks, fixed capacity and SLAs turn this estimate into a contract. If the vendor is a dedicated team, the monthly cost breakdown for dedicated teams shows how to add the client-side costs a rate card hides.

Risks of underfunding or overfunding, and a checklist

When the budget is too low

  • Cliff events. A runtime reaches end of life or a store deadline passes, and an upgrade that would have taken two weeks on schedule takes two months under pressure.
  • Security exposure. Dependency updates are deferred until an advisory forces an emergency release.
  • Knowledge loss. With no steady work, the people who understood the system move on, and every later change costs more.
  • Hidden debt. Small fixes are made without tests or refactoring, and the cost of change rises each year. Our guide to prioritising technical debt explains how to fund the repair.

When the budget is too high

  • Capacity is filled with low-value perfective work because it is available, not because it is needed.
  • Retainers are paid for hours that are not used and not rolled over.
  • The percentage becomes an entitlement rather than a plan, and nobody revisits it.

Year-two budget checklist

  • System inventory with owners, including supplier accounts and renewal dates.
  • End-of-life and store-requirement dates for the next 18 months.
  • Keep-the-lights-on estimate by category, in person-weeks and currency.
  • Perfective budget agreed with the business as a separate line.
  • Run costs annualised from real invoices, with a growth assumption.
  • Contingency of 10 to 15%.
  • Engagement model and SLA matched to the work.
  • Quarterly review date in the calendar, with actuals against plan.

Action: if more than two items on the checklist are missing, the budget is a percentage in disguise. Fill the gaps before the start of the financial year.

Frequently asked questions

Is 15 to 20% of build cost per year a reasonable maintenance budget?

It can be a reasonable starting point for a mid-sized system that excludes new features, but it has no authoritative source and it underfunds small systems, where platform and store changes take a larger share. Use it to sense-check a bottom-up estimate, not to replace one.

Why do some sources say maintenance is 60 to 90% of lifetime cost?

Because they count every year of a long-lived system, including improvements and new features, against a single build. Over ten or more years that share is plausible; for budgeting year two it is not useful. Always ask which kinds of maintenance a figure includes.

What is the minimum we can spend in year two without taking on risk?

The keep-the-lights-on floor: fixing defects, applying security and dependency updates, meeting runtime and app store deadlines, and monitoring. Skipping it usually costs more later, when an upgrade or incident has to be handled under pressure.

Should maintenance be a retainer or billed by the hour?

Steady keep-the-lights-on work suits a monthly retainer with agreed response targets; upgrades and features suit separately estimated projects. Many organisations combine the two so that urgent work has guaranteed capacity and larger changes are decided on their merits.

Does a newer tech stack mean lower maintenance cost?

Not necessarily. A modern stack often has faster release cycles, so adaptive work arrives more often, while a stable older stack may change slowly but carry security and hiring risk. What matters is knowing the lifecycle dates and planning upgrades before they become urgent.

How does PoliteTech estimate maintenance for a system it did not build?

We start with a technical health check of code quality, dependencies, security, infrastructure and documentation, then size a monthly support plan to the expected effort and estimate larger work separately. Ownership of repositories and accounts stays with the client.

Sources and methodology

Guidance reflects PoliteTech delivery experience. The external references below informed specific points in this article.

  1. US GAO: GAO-19-471, Agencies Need to Develop Modernization Plans for Critical Legacy Systems (June 2019) — accessed 10 November 2026. The figure that about 80% of a planned USD 90 billion-plus federal IT budget goes to operating and maintaining existing investments.
  2. ISO: ISO/IEC/IEEE 14764:2022 Software engineering, Software life cycle processes, Maintenance — accessed 10 November 2026. The international standard that defines maintenance types and separates maintenance from operations.
  3. Node.js: Previous releases and release lifecycle — accessed 10 November 2026. LTS releases receiving critical fixes for 30 months and odd-numbered releases reaching end of life after six months.
  4. Android Developers: Meet Google Play’s target API level requirement — accessed 10 November 2026. The 31 August 2026 target API level requirement and its effect on apps that fall behind.
  5. Apple Developer: Apple Developer Program — accessed 10 November 2026. The USD 99 annual membership fee used in the run-cost table.

Need a year-two budget you can defend to your board?

We can run a technical health check on your system and turn the findings into a keep-the-lights-on estimate, a run-cost forecast and a support plan sized to the real work.